Applicant Exhibit A-78,consisting of Note Re Lube Oil High Temp Switch DG1B
ML20086U149
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/01/1995
From:
GEORGIA POWER CO.
To:
References
OLA-3-A-078, OLA-3-A-78, NUDOCS 9508030289
Download: ML20086U149 (4)


Text

- - - _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _

(zffjS-00'3 b/Yffs hW DOCK USNRC 1TSH19153 LUBE OIL HIGH TEMPERATURE SWITCHL 14 A10 :23 O

noin Prior calibration was performed on 3/14/90. At i was found out of tolerance with an as found of 300 *F to trip?a t was calibrated and returned to service with a < rip of 199 F. It was removed from service on 3/23/90 as the suspectes cause.o tri switch calibration was checked and would not calibrate within tolerance. p. The It was I

l placed in storage on 3/23/90.

SWITCH TWO This switch was placed in service on 3/23/90 with a trip of 203.4 *F and a reset of 198.0 *F.

On 3/27/90 it was removed from service and it's calibration l

checiecL. As found was 203.5 *F to trip ar,d 199.5 c egreei to However e o d swit,e?t was found to be venting continuously anc stasequenty rep a s was placed in storage on 3/27/90.

ITHS19146 LUBE OIL HIGH TEMPERATURE SWITCH DG1A l

Prior calibration was performed on 3/3/90. At that time it found out of tolerance with a trip point of 211.0 *F and a reset of 203.1 *F switch was calibrated and returned to service with a trip point of 200.2 *F an a reset of 193 degrees On 3/30/90 the switch was moved for calibration and found out of tolerance with

.4 *F a a reset of 188.0 *F.

The switch operated O cluasn,a trip point of 1 shly. It was ce. wi a new switch calibratec to trip poin 201.27 *F and'a reset of 196.2

  • F. The new switch was returnec, to service, oririnal switch is in storage.

ITSH19117 JACKET WATER HEATER OUT HIGH TEMPERATURE SWITCH DGIB Prior calibration on 3/14/90 was within tolerance with a trip point pf 201 *F and a reset of 193 *F.

On 3/26/90 switch was found out of tolerance with a Mo reset of 182.4. Further i1vestination determinec. a small leal. point of 190,.6 and a-A new switch aso failed leak test. A thirt swite'h calibrated correcty with a 1 rip noint of 200.67 ciegrees and a reset of 196.93 *F and was returned to service. "he old switches are '

in storage.

l ITSH19119 JACKET HEATER OUT HIGH TEMPERATURE SWITCH DG1B Prior calibration on 3/14/90 was within tolerance with a trip point of 200 *F cnd a reset of 194 'F.

1 On 3/26/90 the switch was found out of tolerance with a trin noint of188.2 *F cnd a reset of 180.6 *F. Further investigation determined a small Teak. A new switch was ino >erable due to a missing gasket. A third switch was cah~brated with p trip point of : 98.57 and a reset 191.90 and returned to service. Old switc 2es are I

i Qsnstorage.

9508030289 950601 92 PRCCECT PDR ADOCK 05000424 0o6218 C

PDR

\\

3 l

.i

,4-G

,11 k

i e

\\%D 7

\\,

-a\\

e

\\ \\

R l w):

%w d

o a

s h,,

s$

.c es o s.

8$$

7 J

SYY

\\s.

3 cu

%D v

y I M 3: 331a}]l

~.

j

.O TEl@ERATURE SWrrCHES l

bGH TEMPERATURE SWITCH IB

~ in=1 calibrat)a Removed agplaced as n

490.

N cah$ ratio d not within tolerance. n was i

SWITCH 2 Switch was removed n

by MWO W 1 for calibrat'en cback. It was to tia=

was lacet. Tss switch m +ia bi on e trip and. reset anoes M sa rv mt not

,ly close upon reset? Pa m storage 3/27/90.

1TSF:19146 3 OIL HIGH TEMPERATURE SWITCH i

1A nin=1 calibration 3/1040.

Trin point was,

. - Swi was places,feh appeared ain storage on !

/E 1lM)0 on d

was rep has not : men

- -- _ _ agam.

SH191:,7 urr WATER HEATER OUT HIGH TEMPERATURE 3

BM%,ati n at Tocation of ene,ne.

us to aha++-g.

paoMf m. Switcli was t<sting.

gp 3/[16/90.

wi 1

,mwn 1,

testse on vend.or to o was W%wi=

So perate satsfactory Re"d*fe"#.hs!'n tn "L' Ten 1L*eL%"cet d

in storage on 3/27/90.

i O

92 PftOJECT i

0o6219 i

O 77bER HEADER OUT MGHTEMPERATURE

' ria=1 cali don 3/,14/90.

g attempt w h 8T % yb*

M E"*-

on3%&

in s<;orage at that time.

switch tw L

venc or.nd found to be sa ry on returned to storage.

Mg MAIN HEADER OUT HIGH

]

1A nb1683 o M and n retestec..

LT f

MAIN HEADER OUT HIGH

]

. I was re 9E1863 acec, m storage on 3/31/90. p a i

O TEST FOR CAILO TURE SWIICHES e o J B L " "ti a

  • r "' Je 4"ar**r#M,of=m229**mr.M42gi% H

.r

$fN" b

. We wiI in tempe ture$mth ak reset.

U.

switches E*o not co we e

p g g en g swi to.ttemp,t to root c.use l

4 92 PftOJECT 006220 i

PRESSURE SWITCHES IPSL4903 3

gRMALTRIP

[- 3j PdMee&=bcedin storage on3/2"aM'.**nsor 1*m- "tr*%

and then was p 1PS4749A PRESSURE LUBE OIL 1A was romove l and7 ririsul calibration 10/2

. Swites won (d not cheeked on 3/3 19001 reset, was repla

, an in storage.

/k' P1 SSURE LUBE OIL Original ca'ibgon 1 3/3040 gr was E$ecEeYsa*thactobut rep an b storage Y

P1 SSURE LUBE OIL o

Dati Original calibration 10/21/88. See 1PS4749B.

h N

IC BOARD Nhile working MWO 19001 coald uced who'Liete*ctive, repbw*l in storage on noor tri Tse roun e

PROPOSED CAIf0N PRESSURE SWITCH TEST checu a!*Yi switch

  • h "* 'Elll" To'.h"8T2 so o"

, inspect t se va ve

. seat eroa amam to.

]

se swite s, p

we a normal

~

cal ration nrococ ure to tut ft$ trip point overall rue.

If spoad correctly %we C

not re,tch to swi attempf iden t se root cause

- an.

l

=

LOGIC BOARD TESTING DG1B No further testing of the DG1B logic is planned at this time.