Viit oi x A I?.1-: critic Ax p l'o w n:ir Con t ANY Hicunoun.Vinoix A =acos g
r b
L h
October 25, 1974 F
h P
Mr. Norman C. Mos ley, Director Serial No. 321 Directorate of Regulatory Operations P0&M/JTB:clw United States Atomic Energy Coim:11ssion Region II - Suite 818 Docket No. 50-281 230 Peachtree Street, Northwest License No. DPR-37 Atlanta, Georgia 30303
Dear dr. Moseley:
Pursuant to Surry Power Station Technical Specification 6.6.B.1, the Virginia Electric and Power Company hereby reports an abnormal occurrence which was identified on October 17, 1974.
k During Unit No. 2 shutdown for turbine repairs, cracks were found in h
the concrete supporting the "A" Steam Generator (S/G).
Subsequent ultra-(
sonic test (UT) inspection of the steam generator lower ring support swivel f
end coupling indicated a crack. The swivel end coupling was removed and a e
crack was confirmed. Further inspection of the other lower ring support swivel end couplings in Unit No. 2 was undertaken. UT indications are evident on the other coupling "A" S/G and one of the couplings in "C" S/G.
All couplings are being removed to be radiographed and further inspected.
A detail report will be submitted as Report No. A0-S2-74-09 by January 3, 1975.
We shall continue to keep you informed of significant developments asso<inted with this matter.
(
Very truly yours, fI*
(, yh(Y
') )
C. M. Stallings
~
Vice President-Power Supply and Production Operations
~
cc:
Mr. K. R. Coller kD 0