'D % ecompany gr., -
'> a
.M sNppinopo,i. e4 ison ooo.
THOMAS P. NOONAN (412) 393 7622 ga g,,g*a' July 20,1995 F a" (2) 885-d'o5 I
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 l'
l'
Subject:
Beaver Valley Power Station, Unit No. I and No. 2 l
BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request Nos. 221 and 90 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above licenses in the form of changes to the technical specifications. The proposed l
change will modify the Limiting Condition for Operation 3.8.1.1 titled, "A.C. Sources-Operating," and associated surveillance requirements.
This proposed amendment represents the revised proposed operating license change request discussed in the Duquesne Light Company letter to the Nuclear Regulatory Commission dated September 6,1994. An implementation period of 60 days is requested following the effective date of the amendment.
The proposed technical specification changes for Unit No. I and Unit No. 2 are presented in Attachments A-1 and A-2, respectively. The safety analysis (including the no significant hazards evaluation)is presented in Attachment B. The typed replacement technical specification pages are presented in Attachments C-1 and C-2.
This change has been reviewed by the Onsite Safety Committee and Offsite Resiew Committee. The change was determined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the attached safety analysis.
Sincerely, W
T. P. Noonan c:
Mr. L. W. Rossbach, Sr. Resident inspector Mr. T. T. Martin, NRC Region I Administrator r
DEllVERING Mr. D. S. Brinkman, Sr. Project Manager d
OUALITY
'g Mr. W. P. Dornsife, Director BRP/DEP 3 $(d$4aiers(BRP/DEP) l 9507310177 950720 PDR ADDCK 05000334 P
PDR J
A AFFIDAVIT FOR APPLICATION 3
OF AMENDMENT i
COMMONWEALTH OF PENNSYLVANIA)
) ss:
COUNTY OF BEAVER
)
i f
Subject:
Beaver Valley Power Station, Unit No.1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating Licens'e Change Request Nos. 221 and 90 f
t' Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Thomas P. Noonan, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Operations of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing subrnittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowlelge, infonnation and belief.
W Thomas P. Noo' an n
Subscribed and sworn to before me onthis#NayofM
/fff
/
/
Notary Public '
yg,ny,ggygg,y,3n, p
My C mm ss pi es u 3 999 j
Merrcor,Pennsyuna Aamrmamof Nenos
t ATTACHMENT A-1 s
Beaver Valley Power Station, Unit No. 1 Proposed Technical Specification Change No. 221 The following is a list of the affected pages:
Affected Pages:
3/4 8-1 3/4 8-2 3/4 8-3 i
B 3/4 8-2 l
1 4
+- -
.