MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196G9681999-06-22022 June 1999 Informs NRC That BC Ryan Will Be Leaving Ks State Univ for Position with Wolf Creek Nuclear Operating Corp,Effective 990701 05000482/LER-1999-007, Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl1999-06-18018 June 1999 Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl ML20196A0251999-06-17017 June 1999 Requests That Written Exams for Reactor Operator & SRO for Plant Be Administered Beginning Wk of 990719 & Followed by Operating Exam During Wk of 990726 to Personnel Listed in Attachment.Proprietary Info Encl.Proprietary Info Withheld ML20195K0641999-06-15015 June 1999 Forwards MOR for May 1999 for Wolf Creek Generating Station & Corrected Page 2 of 2 of Apr 1999 Mor,Adding That Unit Entered Intomode 5 for Restart During Month of Apr & Correcting Shutdown Duration Hours from 672 to 671 ML20195G4391999-06-11011 June 1999 Provides Details for Missed Rept Re 10CFR50.46 Thirty Day Rept of ECCS Model Revs.Attachment I Provides Summary of Commitments Made in Submittal 05000482/LER-1999-005, Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl1999-06-11011 June 1999 Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl 05000482/LER-1997-027, Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util1999-06-0404 June 1999 Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util ML20195B9811999-05-26026 May 1999 Forwards 1998 Annual Repts for Ks Electric Power Cooperative Inc,Ks City Power & Light Co & Western Resources,Inc, Including Wholly Owned Subsidiary Kg&E Co ML20196L3361999-05-18018 May 1999 Forwards Rev 1 to Cycle 11 COLR for WCGS, IAW TS Section 6.9.1.9 05000482/LER-1999-004, Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER1999-05-12012 May 1999 Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER ML20206Q8141999-05-11011 May 1999 Requests NRC Work with Industry to Resolve Generic Changes to Allow Permanent Change to TSs Prior to June 2000.Encl Provides TS Limited Duration Action Statement Until 990930 05000482/LER-1999-003, Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl1999-05-10010 May 1999 Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl ML20206K5141999-05-0707 May 1999 Provides Info Re Number of Tubes Plugged in Each Sg,As Required by TS 4.4.5.5.ISI of SGs B & C Completed on 990424,resulting in Mechanical Plugging of One Tube in SG B & Five Tubes in SG C ML20206J0711999-05-0505 May 1999 Forwards Guarantees of Payment of Deferred Premiums for Owners of Wolf Creek Generating Station,As Required by 10CFR140.21 ML20206D9551999-04-29029 April 1999 Forwards 1999 Annual Radioactive Effluent Release Rept 22, for Reporting Period Jan-Dec 1998,per Section 6.9.1.7 of WCGS Ts.Attachment to Ltr Identifies Commitments Resulting from Correspondence ML20206C7321999-04-22022 April 1999 Provides Notification of Changes at WCGS Affecting Plant Physical Security Plan,Per 10CFR50.54(p).Changes Identified in Attachment I Will Be Incorporated Into Plan by 990831. Commitments Made by Util Are Included in Attachment II ML20206B2051999-04-20020 April 1999 Forwards Revs to RERP Implementing Procedures,Including Rev 1 to EPP 06-001, CR Operations, Rev 1 to EPP 06-002, TSC Operations, Rev 3 to EPP 06-004, Public Info Organization & Rev 1 to EPP 06-005, Emergency.. ML20205L7431999-04-0606 April 1999 Confirms 990401 Telcon with NRC Re Late Payment Notice That Util Received for Invoice RL0295-99.Licensee Understands Invoice to Be Cancelled ML20205F1601999-03-30030 March 1999 Forwards Rept Re Status of Decommissioning Funding for WCGS, Per 10CFR50.75.Kansas Gas & Electric Co Decommissioning Trust Agreement,Encl ML20205K9481999-03-26026 March 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-482/98-05.Corrective Actions:Training Was Provided to Mrep Members Through Use of Contract Individual Experienced in Maint Rule Programs.Change to Commitment Date,Encl ML20196K7261999-03-26026 March 1999 Forwards Certified Copy of ITS & ITS Bases,As Committed in Licensee to Nrc.Summary of Editorial Corrections, Also Encl ML20205A1961999-03-25025 March 1999 Provides Suppl 2 to 970515 Application for Amend to License NPF-42,providing Changes to TS Based on 990310 & 19 Discussions with NRC Re Conversion to Improved TS 1999-09-03
[Table view] |
Text
- --- - - _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .__ _ _ _
4 s
NUCLEAR OPEFMTING CORPOFMTION F u t st l imoden vge newu,ot t venna a T.on.u.i se,,u.* N ember 24, 1991 ET 91 0235 U. S.11aclear Regulatory Commission ATTN Document Control Desk Mail Station PI-137 Vashington, D. C. 20555 Reference Letter dated June 28, 1991. Generic Letter 88-20 Supplement 4 ' Individual l'1 ant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities
- 10 CFR 50.54(f)'
Subject:
Docist No. 50-4B2 Response to Generic Letter 68-20 Supplement 4 Gentlemen:
The purpose of this letter is to transmit Volf Creek Huclear Operating Corporation's (VCHOC) response to Generic Letter 88-20, Supplement 4:
' Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities - 10 CFR 50.54(f)'. The Reference requires the performance of a systematic examination to identify any plant-specific rulnerabilities to severe accidents and report the results to the Comminsion.
Attachment 1 provides the proposed program f or completing u;e Individual Plant Examination for External Events (IPEEE) for Volf Creek Generating Station and the schedule for submitting the results to the Commission.
If you have any questions concerning this matter, please contact me or Mr. S. G. Wideman of my staff.
Very truly yours, sx j f.J f]o '
- 97 / , /f p Forrest T. Rhodes Vice President
' Engineering & Technical services FTR/aem Attachment cci A. T. Howell (HRC), w/a R. D, Martin (NRC), w/a G. A. Pick (NRC), w/a /
,,V. D. Reckley (NRC). w/a
/[jf f
~
4 m u-,4 .,_s .4 An r now onacw, e mr>,c, u r m vn
,,,, n , o - ,
i1
STATE GF KANSAS )
) SS COUNTY OF COFFEY )
Forrest 7. Rhodes, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering and Technical Services of Wolf Creek 11uclear Operating Corporations that he has read the foregoing document and knows the content thereof that he has exeruted that same for and on behalf of said Corporation with full power and authority to do son and that the facts therein stated are true and <:orrect to the best of his knowledge, information and belief.
{' g,,l j , s .1 ]
By '/Wj' Forrest T. Rhodes l
' /t/ ~
./
Vice President Engineering & Technical Services SUBSCRIBED and sworn to bef ore me this J3 day of d< s. . 1991.
l l) 13 km. ! [,
p 'N'Jit' N.r, 110tary Public
t.,,[w
[l:f'
. , ! C1
, * :s Expiration Dato c/ ' 'l '/ g l j. E tf.,'..Ip' ,..~....
y a g?
,,s&
N
Attachment to ET 91-0235 Page 1 of 2 Response to Generic Letter 88-20 Suppicment 4 ,
l
' Individual Plant Examination of Eaternal Events (IPEKE) for Severe Accident Vulnerabilities - 10 CFR 50.54(f)'
Generic Letter 88 20 Supplement 4, requests licensees to describe their proposed programs for completing the Individual Plant Examinations of External Events (IPEEEs) by Dec.1ber 24, 1991. As stated in NRC SECY 91-102, the procedures for the seismic walkdown portion of this program are
'one of the most important ingredients in the seismic IPEEE'. Because of similarities between the USI A.46. 'Sej smic Qualification of Equipnent in Operating Plants', at,d seismic IPEEE programs. Wolf Creek Nuclear Operating Corporation (WCNOC) intends to train seismic IPEEE walkdown personnel at training courses currently being developed by the Seismic Qualification Utility Group (SQUG). However, the anticipated Supplemental Safety Evaluation Rouart (SSER) on tho SQUG's Generic Implem'sntation Procedure (GIP) for resolution of USI A-46 has not been made a'allable in sufficient time to permit fina11tation and scheduling of the SQUG training courses.
VCNOC intends on conducting the seismic IPEEE program as described below.
Upon receipt and review of the SSER, WCNOC may modify its progtam and/or schedule for conducting the seismic IP2EE depeading on the content of the SSER and resolution of open issues.
Request Identify the methods and approach selected for performing the IPEEE.
Response
VCNOC will perform a seismic Level 1 PRA plus containment performance analysis for Wolf Creek Generating St* tion (WCGS) to meet the evaluation requirements for seismic events. The selas..ic PRA vill use current methods and plant information. The seismic enhancements identified in Apper; dix 1 of Generic Letter 88-20, Supplement 4 will be considered as part of the WCGS l seisg'ic PRA.
(
VCNOC will perform a fire FRA to meet the evaluation requirements for internal fires.
VCNOC will use a screening type approach shown in Figure 1 of Generic better l
88-20. Supplement 4 to evaluate the impact of high winds, external floods, r and transportation and nearby facility accidents on WCGS.
l Request Describe the method to be used if it h&a not been previously submitted for staff review (the description r.ay be by reference).
_ . . . - ~ . _ _ _ _ . _ _
Attachment to ET 91-0235
, '? age 2 of 2
. Response The above methods have been described in Generic 1.etter 88 20. Supplement 4, as acceptable to the NRC Staff.
Request Identify the mil.estones and schedule for performing the IPEEE, and submitting the results to the NRC. ;
I
Response
January, 1994 Preliminary evaluation completed for high i winds, floods, and Transportation and Nearby Facility Accidente June, 1994 Preliminary analysis completed for internal fire event 6 L
January, 1995 Preliminary analysis completed for seismic !
f events i- ,
September, 199$- IPECE report submitted to NRC L The WCHOC personnel who are currently developing the Individual Plant >
E Examiation (IPE) f or WCGS are the same individuals who will perform the ;
analyses for the IPEEE. Therefore, the initiation of the IPEEE work will be delayed until. completion and submittal of the IPE report. The WCGS IPEEE submittal schedule is based on the IPE submittal date (September 1992) plus .
3 years. This schedule allows WCNOC to utilize the experience and knowledge gained in developing the IPE and maximize the amount of the WCGS IPEEE werk that will be performed by WCN00 personnel.