ML20086R471

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-38,requesting Changes to Bases 3/4.6.2,depressurization & Cooling Sys,Bases 3/4.7.1.2,EFWS & Bases 3/4.8,electrical Power Sys
ML20086R471
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/26/1995
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086R475 List:
References
W3F1-95-0116, W3F1-95-116, NUDOCS 9507310153
Download: ML20086R471 (3)


Text

m y:

= ENTERGY ,

lT*E"s """'"""*'

Ki3ona. LA 70066 Tc! 504 739 6774 R. F. Burski Ovector.

hu;icar Safety Vtantom 3

  • W3F1-95-0116 A4.05 PR July 26, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Technical Specification Bases Change  :

Gentlemen:

Waterford 3 requests that a change be processed for the following Technical Specification Bases: i e BASES 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS - The bases associated with 3/4.6.2.2 CONTAINMENT COOLING SYSTEM is modified by providing clarification information related to TS LCO 3.6.6.2 as revised by license Amendment 39.

BASES 3/4.8 ELECTRICAL POWER SYSTEMS - The bases associated with 3/4.8.1 A.C. SOURCES is modified by adding information concerning the i specified integrated diesel generator surveillance testing requirements. l Waterford 3 committed to add information to this TS bases to clarify the 3 phrase " permanently connected loads" in response to NRC violation  ;

50-382/9425-01 that documented a failure to perform testing of AB electrical bus. )

I 9507310153 950726 PDR ADOCK 05000382 P PDR 7 I

l I .. .'

Technical Specification Bases Change W3F1-95-0116 Page 2 July 26, 1995 Attachment A contains the existing affected TS bases sections. Attachment B contains the revised bases sections. This request does not involve a change to the plant or plant operating procedures. The proposed changes have been reviewed by the Plant Operations Review Committee and approved by the General Manager Plant Operations.

Should you have any questions or comments on this matter, please contact Paul Caropino at (504) 739-6692.

Very truly yours,

]b, n<J R.F. Burski Director Nuclear Safety RFB/PLC/ssf Attachments cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office, Administrator Radiation Protection Division (State of Louisiana)

American Nuclear Insurers i

l i

I o

_ .-. . a _. . - , .. - -- -. - . - . . .._...

4._.,

4 9 1

'A

?

k e

8 I

h 7

W3F1-95-0116 ATTACHMENT A r

r y>w- - . v . . . . 7 _.

.y. _ _ , _ _ , ,, , _ _ , _ _ . _ , , ..m, , , , , , , . , _ . _ _ _ , _ m_