ML20086R006

From kanterella
Jump to navigation Jump to search
Amends 208 & 212 to Licenses DPR-44 & DPR-56,respectively, Relocating Nrb Review Requirements,Iseg Requirements & Certain Review & Audit Requirements from TS
ML20086R006
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/25/1995
From: Stoltz J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20086R009 List:
References
NUDOCS 9507280291
Download: ML20086R006 (16)


Text

..

~

pd"%q p

i UNITED STATES g

j NUCLEAR REGULATORY COMMISSION j

i WASHINGTON, D.C. mnnan annt

%*****/

i PECO ENERGY COMPANY PUBLIC SERVICE El.ECTRIC AND' GAS COMPANY j

DELMARVA POWER AND LIGHT COMPANY 1

ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 i

PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 208 I

License No. DPR-44

- l 1.

The Nuclear Regulatory Comission (the Comission) has found that:

?

A.

The application for amendment by PECO Energy Company, et al. (the licensee) dated November 14, 1994, as supplemented by letter dated April 10, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.

f B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; f

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and-i safety _ of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations;-

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health or safety of the public; and r

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of-.

the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:

9507290291 950725 ~

~

PDR ADOCK 05000277 1

P PDR I

Y'.:'

}

s i

i

i t

(2) Technical Snecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 208, are hereby incorporated in the-license. PECO shall operate the facility in accordance with the Technical Specifications.

3.

This license ~ amendment is effective as of its date 'of issuance.

l FOR THE NUCLEAR REGULATORY COMISSION j

7 J n F. Stolz, Dire r

oject Directorate

-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

.l

Attachment:

Changes to the Technical l

Specifications j

Date of Issuance: July 25, 1995 I

i i

i

\\

l i

t

+

?

l

k, ATTACIMENT TO LICENSE AMENDMENT NO. 208 f

FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 l

Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.

Remove Insert I

Appendix A 245b 245b 250 250 l

251 251 l

252 252 Appendix B 48 48 i

i r

i e

\\

l i

e

-vw-e- - -

.e..,-r-,----,ew,e--r

---.-n

-e, e

.nw.m-----,nn,

.,,, - -_-- - - -. =*-


,n-

Unit 2 THIS PAGE INTENTIONALLY LEFT BLANK l

i,

-245b-Amendment No. 158, 208 i

e

W

~. -

i

)

Unit 2

~

PBAPS-Alternates 6.5.2.3 A current list of alternates shall be maintained in NRB records. Each alternate member will serve on a continuing basis. Alternates shall vote only in the absence of that member for whom they are the designated alternate.

i Consultants 6.5.2,4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB.

I Meetina Freauency 6.5.2.5 The NRB shall meet at lesst once per calendar quarter.

i Ouorum 6.5.2.6 A quorum of the NRB shall consist of the Chairman or Vice Chairman or their designated alternates and four members or their alternates. No more than a minority l

of the quorum shall have line responsibility for i

operation of the facility.

1 6.5.2.7 DELETED.

i i

\\

t

-250-Amendment No. 72, 37, 47, 63, 175, TyS, 208

Unit 2 PBAPS 6.5.2.8 DELETED l

\\

-251-

. Amendment No. 37, H, 170, 174, 132, 208

e Unit 2 i

PBAPS t

~

Authority i

6.5.2.9 The NRB shall report to and advise the Executive Vice President -

Nuclear.

Records 6.5.2.10 Records of NRB activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each NRB meeting shall be prepared, approved and forwarded to the Executive Vice President - Nuclear within 10 working days following each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7.e, f, g, and h, above shall be prepared, approved and forwarded to the Executive Vice President - Nuclear, within 10 working days following completion of the review.

i i

l r

6 i

l

-252-Amendment No. 72, 37, 102, !!!, 114, 130, 155, 194, 208

U..

4

+

  • [

Unit 2

[

i PBAPS f

i

.j b

I i

I 7.0 Administrative controls l

7.1 Oraanization, Review and Audit-l l

7.1.1 Organization l

i A.

The Plant Manager-is responsible for the operation of. the facility. and to assure that the facility l

operates within the limits set forth in the environmental technical specifications.

i B.

In all matters partaining' to operation of the facility and to ' the environmental

. technical-specifications, the Plant Manager shall report to, and consult with the Vice President-PBAPS.

l 7.1.2 Review and Audit 1

J Committees for review and audit of plant operation are described in the Quality Assurance Program.

l

\\

l

' Amendment No. 102, 183,.208

=

.--e,--

.w-

.m,

,..,.r w

--,w r

ewe-

+w-,

--m,--

i-m-->

++

we*,=----~yww y v*

vvw-t*

-pr'<

i:'

pn ce u UNITED STATES y

j j

NUCLEAR REGULATORY COMMISSION -

~

f WASHINGTON, D.C. 20066-4001

%...../

PECO ENERGY COMPANY

_PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY l

ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 212 License No. DPR-56 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by PECO Energy Company, et al. (the licensee) dated November 14, 1994, as supplemented by letter dated April 10, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health or safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of r

the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical i

Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:

~}

vo-4 i

i-j

.. i :

(2) Technical Snecifications -

The Technical Specifications contained in' Appendices A and B, as i

revised through Amendment No. 212, are hereby incorporated in the license.

PECO shall ' operate the facility in accordance with the Technical Specifications.

3.

This license aniendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY ~ COMMISSION 1k (L-I o

F. Stolz, Direc r ject Directorate

-2.

Division of Reactor Projects - I/II l

Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical i

Specifications Date of Issuance: July 25, 1995 T

i s

I

I 1

ATTACHMENT TO LICENSE AMENDMENT NO. 212 l

FACILITY OPERATING LICENSE NO. DPR-56 1

i DOCKET NO. 50-278 i

i Replace the following pages of the Appendix A. Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.

Remove Insert l

l Appendix A 245b 245b 250 250 251 251 252 252 Appendix B 48 48 l

l t

f i

i i

4 g.

a f

i l

j

.a-o-

Unit 3 l

THIS PAGE INTENTIONALLY LEFT BLANK s

i

)

\\

-245b-Anendment No. 160, 212 9

1

Unit 3 PBAPS

. Alternates.

- 6.5.2.3 A current list of alternates shall be maintained in NR8 records.

Each alternate member will serve on a continuing basis. Alternates shall vbte only in the

-absence of that member for whom they are the designated alternate.

Consultants

' 6.5.2.4 Consultants shall be utilized as determined by the NRB Chairman to provide expert advice to the NRB.

4 Meetina Freauency 6.5.2.5 The NR8 shall meet at least once per calendar quarter.

Ouorum 6.5.2.6 A quorum of the NRB shall consist of the Chairman or Vice Chairman or their designated alternates and four members or their alternates. No more than a minority of the quorum shall have line responsibility for operation of the facility.

6.5.2.7 DELETED.

t i

r

\\

)

-250 Amendment No. 72, 37, 47, $2, 115, 160, 212 d

I Unit 3 PBAPS 6.5.2.8 DELETED 4

-?.51-Amendment No. 37, 55, II3, IIB, 135, 212

y Unit 3 PBAPS Authority 6.5.2.9 The NRB shall report to and advise the Executive Vice President -

Nuclear Records 6.5.2.10 Records of NRB activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each NRB meeting shall be prepared, approved and forwarded to the Executive Vice President - Nuclear within 10 working days following each meeting.

l b.

Reports of reviews encompassed by Section 6.5.2.7.e, f, g, and h, above shall be prepared, approved and forwarded to the Executive Vice President - Nuclear, within 10 working days following completion of the review.

j 1

l

-252-Amendment No. 70, 37, 104, 115. IIS, 135, 157, 198, 212

\\

z-3,.s

-,g I'

'I Unit 3 i.!

PBAPS i

.i t

I i

5 i

7.0 Administrative controls 7.1 Orcanization.' Review and Audit 7.1.1 Organization A.

The Plant Manager is responsible for the operation of the - facility and' to assure that the facility operates within the limits set forth in the environmental ~ technical specifications.

B.

In all matters pertaining to operation of the.

^

facility and to the environmental technical i'

specifications, the Plant Manager shall report to, and consult with the Vice President-PBAPS.

t 7.1.2 Review and Audit i

r Committees for review and audit of plant operation are described in the Quality Assurance Program.

l

,\\

' Anendment No.104, ISS, 212 l

l I

l t

6

.