- w Vepco Surry Pour Station P.O. Box 315 Surry, Virginia 23883 Jar.uary 20 1975 Director of Reguistory Operations 230 Peachtree Suite B18 Atlanta, Georgia 30303 t
This is to officially inform ~you by telecopy within twenty four (24)
?
hours of an Abnormal Occurrence that occurred on January 19 1975 at surry.
Nuclear Power Station.
Unit one reactor was at intermediate shutdown condition during post refuel.1ng start up.
Containment partial pressure had been establish.d.
Tw va)ves in the Station Instrument air supply to the Contaltunent Instru-ment air system wre open in victatice of Tech. Spec. 3 8.
The two valves were shut and locked in accordance w3 th operating proced ures.
- f. f -
24 E. M. Sweeney, Jr.
Station Manager 7
y 1*
.lj
>?
6l',
,..r n;
-; ?/;
F
-n : 7-n 8402280617 750224
'4
.i O-d PDR ADOCK 05000200 T