ML20086Q790

From kanterella
Jump to navigation Jump to search
Suppl to TS Change Request NPF-38-160 to License NPF-38, Revising TS SRs 4.4.2.1,4.4.2.2 & 4.7.1.1 to Include as Left Setting Requirement for Pressurizer & Main Steam Line Code Safety Valves Consistent W/Revised C-E STS (NUREG-1432)
ML20086Q790
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/25/1995
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086Q793 List:
References
RTR-NUREG-1432 W3F1-95-0121, W3F1-95-121, NUDOCS 9507280194
Download: ML20086Q790 (3)


Text

__ _ _ _ - _ . - - - - - - - _ _ _ -

  1. p.,

a

&y ENTERGY """"e"""*""'

S K$on.1. LA 70066 Tel 504 739 6774 R. F. Burski Dwoctor.

Mrk;ar Safety Wawford 3 W3F1-95-0121 A4.05 PR  ;

July 25,1995 l-U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 ,

Subject:

Waterford 3 SES I Docket No. 50-382 License No. NPF-38 Supplemental Informatior. Regarding Technical' Specification Change Request NPF-38-160 Gentlemen:

By letter dated December 9,1994 Waterford 3 proposed the subject Technical

, Specification (TS) change. The proposed change revised the Limiting Condition For Operation (LCO) allowable opening tolerances on the Pressurizer Code Safety Valves (TS 3.4.2 and 3.4.3) and the Main Steam Line Code Safety Valves (TS Table 3.7-1) from i1% to i3%. The Proposed change also stated that if, the setpoint was found outside of a 11% tolerance band, the setting would be adjusted to within 11% of the specified lift setting. The revised Cor.oustion Engineering standard technical specifications (NUREG-1432) incorporates an "as left" setting requirement in the TS surveillance for Pressurizer and Main Steam Line Code Safety Valves. Consistent with this approach, Waterford 3 requests that the TS Surveillance Requirements associated with the subject request

( .i .e. , 4.4.2.1, 4.4.2.2 and 4.7.1.1), be modified to include an as left setting requirement as indicated in Attachment A. This request is purely administrative and has no impact on the no significant hazards determination provided with the initial proposal.

, 0 9507280194 950725 k \

PDR ADOCK 050003G2

~ P_ PDR

~

^

Supplemental Information Technical Specification Change Request NPF-38-160 W3F1-95-0121 Page 2 July 25, 1995 Should you have any questions or comments concerning this request, please contact Paul Caropino at (504) 739-6692.

Very truly yours, R.F. Burski Director Nuclear Safety RFB/PLC/ssf Attachment cc: L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office, Administrator Radiation Protection Division (State of Louisiana)

American Nuclear Insurers l l

l i

i

6 g

e 0

t s

S W3F1-95-0121 ATTACHMENT A i

I t,

f 2

5 t

t

?

I

-- -