PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHI A. PA.19101 (215) 841-45o0 V.S.BOYER May 2, 1973 vier m =>onar Mr. F. Kreusi, Director Directorate of Regulatory Operations United States Atomic Energy Commission Washington, D.C.
20545
Subject:
Significant Deficiency Interim Report Peach Bottom Atomic Power Station - Unit No. 3 AEC Construction Permit No. CPPR-38 File: QUAL 2-10-2 (SDR No. 4)
Dear Mr. Kreusi:
In compliance with 10CFR Part 50.55 paragraph (e), we are hereby submitting the attached Significant Deficiency Interin Report concerning the core spray sparger - Unit No. 3 The AEC DRO I inspector was notified of this item during his site visit at Peach Bottom on March 30, 1973 Sincerely,
/j //
- f. A W[
Copy to:
J. P. O'Reilly, USAEC Attachment
/
.Jbf r
p 8402270601 740603 PDR ADOCK 05000277 S
PDR 3 0261
_,g-
F SibIFICIANTDEFICIENCYINTER sh REPORT SDRNO.:._h PROJECT:
Peach Bottom Atomic Power Station UNIT:
3 i
- 1. AVAILABLE INFORMATION - DESCRIPTION OF DEFICIENCY An inspection of the Feach Bottom Unit No. 3 core spray sparger revealed certain unacceptable conditions which will require removal and rework
~
of the sparger.
Conditions found which 2equire correctin action include items con-cerning fabrication tack and fillet welds, are strikes, dimensioning*
in assembly of sparger components, and conditions of cleanlimess and preservation.
- 2. AVAILABLE INFORMATION - ANALYSIS OF SiFETY IMPLICATIONS There will be no safety implications following rewo k.
3._AVAILABLE INFORMATION - CORRECTIVE ACTION Rer.ove core spray sparger from Unit 3 vessel and ship to Reactor Controls, Inc. for rework to meet GE APE design requirements.
J e<*e...