ML20086Q543

From kanterella
Jump to navigation Jump to search
Interim Significant Deficiency Rept SDR 4 Re Core Spray Sparger.Core Spray Sparger Removed & Shipped to Reactor Controls,Inc for Rework to Meet GE Ape Design Requirements
ML20086Q543
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/02/1973
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Kreusi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086Q521 List:
References
SDR-4, NUDOCS 8402270601
Download: ML20086Q543 (2)


Text

-_ --

O O PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHI A. PA.19101 (215) 841-45o0 V.S.BOYER vier m =>onar May 2, 1973 Mr. F. Kreusi, Director Directorate of Regulatory Operations United States Atomic Energy Commission Washington, D.C. 20545

Subject:

Significant Deficiency Interim Report Peach Bottom Atomic Power Station - Unit No. 3 AEC Construction Permit No. CPPR-38 File: QUAL 2-10-2 (SDR No. 4)

Dear Mr. Kreusi:

In compliance with 10CFR Part 50.55 paragraph (e), we are hereby submitting the attached Significant Deficiency Interin Report concerning the core spray sparger - Unit No. 3 The AEC DRO I inspector was notified of this item during his site visit at Peach Bottom on March 30, 1973 Sincerely,

/j //

f. A W[

Copy to: J. P. O'Reilly, USAEC Attachment

/

r *

.Jbf p

8402270601 740603 PDR ADOCK 05000277 S PDR 3 0261

_,g-

F sh SibIFICIANTDEFICIENCYINTER REPORT SDRNO.:._h PROJECT: Peach Bottom Atomic Power Station UNIT: 3 i

1. AVAILABLE INFORMATION - DESCRIPTION OF DEFICIENCY ,

An inspection of the Feach Bottom Unit No. 3 core spray sparger revealed certain unacceptable conditions which will require removal and rework ~

of the sparger. -

Conditions found which 2equire correctin action include items con-cerning fabrication tack and fillet welds, are strikes, dimensioning*

in assembly of sparger components, and conditions of cleanlimess and preservation.

2. AVAILABLE INFORMATION - ANALYSIS OF SiFETY IMPLICATIONS There will be no safety implications following rewo k.

3._AVAILABLE INFORMATION - CORRECTIVE ACTION Rer.ove core spray sparger from Unit 3 vessel and ship to Reactor Controls, Inc. for rework to meet GE APE design requirements.

J e<*e... _

+-,m.e

't. SCDCOULEO jiUBMISSION DATE OF COMPLETE SICNIFICIANT DEFICIENCY REPORT Jtily 1,1973 CAF-20 Alv 0 D/1/72 l