Application for Amends to Licenses NPF-35 & NPF-52,changing Tech Specs to Reflect Reorganization Which Decentralized Corporate Mgt of Nuclear Activities to Each Nuclear Site
ML20086P375
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/18/1991
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086P378 List:
References
NUDOCS 9112270007
Download: ML20086P375 (4)


Text

__

Il I

o. var nur company ysnum Catauea Nwlear Gmeruta &partmerit lic, Prestdnt Gl0 Cert:ord kvad (WM31J20$ O!! re fork. SC 2970 @n1)k1(J4261:0 DUKE POWER December 18, 1991 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: Document Control Desk

SUBJECT:

Catawba Nuclear Station

. Docket Nos. 50-413 and 50-414 Proposed Technical Specification Changes Gentlemen:

Pursuant to 10 CFR 50.4 and 50.90, attached are proposed

' license amendments to Appendix A, Technical Specifications, of Facility Operating Licenses NPF-35 and NPF-52 for Catawba Nuclear Station Units 1 and 2, respectively.

Ef fective - November 1, 1991 Duke Power Company implemented a reorganization that essentially decentralized the corporate o management of nuclear activities to each of the nuclear sites.

In meetings with your staff on October _30, 1991, we discussed the new organizational structure and its resultant benefits on overal1~ plant safety and efficiency.

At- that time we also discussed our plans . to revise the documents that-assigned specific corporate responsibilities and functions. We are in the process of revising the Duke Quality.

Assurance (QA)-Topical Report, using the guidance provided in- l Standard Review Plan (SRP) Section 17.3. We will noon be issuing as a special update to each FS\R, a revised Chapter 13,

" Conduct of Operations".

As soon as we have the revised FSAR, the revised QA Topical 1 l Report and the Technical: Specif'.t 'lon revisions in place, we can proceed with the revisite. of other- administrative co - documentation. Your timely' consideration of this request will l

?co5$ certainly help us hasten the completion of this transition. )

$S'

% c- Attachment l' contains the proposed Technical Specification M changes. Attachment 2 contains the summary and justification for the. proposed changes.- Pursuant to 10CFR 50.91, Attachment

.g

,bo 3 provides . the analysis performed in accordance with the i  ;

18 standards contained in 10CFR 50.92 which concludes that the \

p~ c proposed amendments. do not. involve a Significant Hazards i ca Consideration. Duke Power is forwarding a copy of this iO$ amendment request application and No Significant Hazards M1 Consideration analysis to the appropriate South Carolina state

.nn pfficials. The proposed amendments have been reviewed and have I j 0 4%__ -

.4 t._

u

. i o

/. Document Control Desk Page Two December 18, 1991 been determined to have no adverse safety or environmental _ '

impact.

t Attachment 4 consists of draft revised FSAR Chapter 13 pages, which describe in detail managerial functions and responsibilities. It is being provided here for your use in reviewing the proposed Technical Specification revisions.

I request a 30-day grace period for this proposed change to become effective following NRC approval in order to allow the orderly revision of existing implementing documents.

Should there be any questions concerning these proposed amendments or if additional information is required please call R. L. Gill at (704) 373-5826.

Very truly yours, Ns /TC M. S. Tuckman, Vice President Catawba Nuclear Site Attachments:

1. Proposed Technical Specification Changes
2. Summary and Justification
3. Significant Hazards Consideration Analysis
4. Catawba-FSAR, Chapter 13, revised pages xc; (W/ Attachments)

Mr. S.D. Ebt,eter, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Mr. Heywood Shealy, Chief Bureau of Radiological Health South Carolina Department of Health Mr. R. E. Martin Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mr. W. T. Orders NRC Senior Resident Inspector Catawba Nuclear Station

. i ,

/ . Document Control Desk Page Three December 18, 1991 M. S. - Tuckman, being duly sworn, states that he is 'tice President of Duke Power Company, Catawba Nuclear Site; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Catawba

-Nuclear Station License Nos. NPF-35 and NPF-52; and that a)I the statements and matters set forth therein are true and correct to the best of his knowledge.

M.S.T A M. S. Tuckman, Vice President Catawba Nuclear Site Subscribed and sworn to before me the 18th day of December, 1991.

IMAU Y<bM esu Notarp Public /

My Commission Expires:

NcV. 31 <R ! o 0

. s .

f Document Control Desk Page Four December 18, 1991 bxc: (w/ attachments)

R. L. Gill L. T. Burba D. V. Ethington W. M. Sample L. R. Davison A. V. Carr

- R. O. Sharpe M. E. Patrick R. C. Futrell File CN-801.01 NCMPA NCEMC

+

PMPA SREC k