ML20086N883
| ML20086N883 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/17/1991 |
| From: | Zach J WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086N887 | List: |
| References | |
| CON-NRC-91-147 VPNPD-91-441, NUDOCS 9112260007 | |
| Download: ML20086N883 (3) | |
Text
. _..
Wisconsin Electnc PONER COMPANY 231 w Menom Po Ibx 204$ wouw u $3201 14W 2212345 VPNPD-91-441 NRC-91-147 December 17, 1991 U.
S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Hail Station P1-137
- Washington, D.
C.
20555 Gentlemen:-
DOCKET-.50-266 FILING OF OWNER'S REPORT FOR INSERVICE INSPECTION (NIS-1)
POINT BEACH NUCLEAR PLANT, UNIT 1 Attached is the Owner's Data Report for Inservice Inspection, Form NIS-1.
This is being; submitted in accordance with ASME Section XI, IWA-6230.
The information contained in the report reflects the incorvice inspection activities during the refueling outage of Wisconsin Electric Power Company's Point Beach Nuclear Plant, Unit 1.
Very truly yours, in A.
e O
6 c/{-
N
% aa Jam @ J. - Zach Vice President II Nuclear. Power l
Attachment Copy to-Resident' Inspector l
0 l
9112260007 911217 I}
-PDR ADOCK 00000266
'a.
FDR
.4mMfim dilkmhtwqvnepatim
o r
FORM Nis.1 OWNEk'S REPORT FOR INSERYlCE INSPECTIONS e
s As requheti by the Provisions of the ASME Code Rules
- 1. Owner Wi ngonsin Ilectric Powgr. company._231 W. Michigan. Milwaukon, wt A3201 (Name and Address of Owner)
I
- 2. Plant,,,
Point Beach Ngglear Plant. _.MJ,(L,Husjgat RQAd. Two Rivers.1f1
.(241 (Name and Address of Plant)
- 3. Plant Unit..
1
- 4. Owner Certificate of Authorization (if required) Docket 50-266 Si Commercial Service Date 12/21/70 6. National Board Number for Unit N/A
- 7. Components inspected
}
l Manufacturer Component or Manufacturer or installer State or National Aepurtenance or installer Serial No.
Province No.
Board No.
Reactor Press.
Vennel nahenck & Wilcox R-1 0010615 Nn 0138 "B" Reactor Coolant Pump ESCO 2-6183-747G01 Pressurizer' Westinghouse 16A6256-1 0010618 NB 0685
" A" S t e a.*n acnerator Wettinghouse 16A-6339-1 0010616 NB 16A6079-1 Regen 11x Sentry 3996A-1/3fX-30 NB 349 "A" RHR Hx J. A. Oats 1570-4 1967 0010598-NB 0271 Class 1 Pinino Systems Westinahouse Cla s t, 2 MS Pinino Svetens Dechtel Clann 2 DOP Pining Eyrton Weeinghnuto asma_
k k
t Note: Supplemental sheets in form of hsts, sketches, or drawings may be used, provided (1) size is 8% in. x 11 in.,
b (2)information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheetsis recorded at the top of this form.
?
(12 E6)
Th+s 10rm (E00029) may t,e obtemed from the Order Dept,. ASME. 22 Law Drive, Bor 23D0. Fairfield, NJ 07007 2300 J
[
4 g
FORM NIS l (llack)
- 8. Examination Dates 05/25/9L to 05/25/91
- 9. Inspection Interval from to
- 10. Applicable 12itions of Section XI Addenda
- 11. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
Refer to attached summary.
- 12. Abstract of Conditions Noted.
Refer to attached summary,
- 13. Abstract of Corrective Measures Recornmended and Taken. Refer to attached summary.
We certify that the statements made in this report are correct and ths examinations and corrective men.
sures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorisation No, tif applicableH{RC_Rg.chc1JD-2% Expiration Date N/A Wisconsin Electric Darc Dece1@3L6 19 J1._. Signed __fower Cccpany Dy Caew,vm A
Owner Ja 4s J. ZacM Vi President Nuclear Power CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel inspectors and the State or Province of Wisconsin and employed by HSBII Company og Hartford. CT have inspected the components described in this Cwner's Report dunns the period 05/25/90 to 05/.2h/ 91
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the inspection plan and as required by the ASME Code,Section XI, By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the inspector not his employer shall be liable in any manner for any personalinjury or property damage or a loss of any kind ansing from or connected with this inspection.
/
Commissions. /dh?/. W 7.P. M J'
/
Ins [ceto s Signature National Board. State. Province, and Endorr.ements Date __hd1L 19 [ 2 _
9.
- Second Inspection Interval from 12/21/80 to 12/21/90.
- Third Inspection Interval from 12/21/90 to 12/21/2000.
- 10. **Second Inspection Interval,Section XI, 1977 Edition with Summer '79 Addenda.
- Third Inspection Interval,Section XI, 1986 Edition without Addenda.
--