Monthly Operating Repts for Jan 1984
ML20086N513
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/31/1984
From: Reavis J
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8402210122
Download: ML20086N513 (16)


Text

-.

DUKE POWER GOMPANY P.O. HOK 33180 CHARLOTTE, N.C. 28242 HAL B. TUCKER Tztzenown

= = - February 15, 1984 (ro4) ora-4 san Director-Office of Inspection and Enforcement U. S. Nuclear Regulatory Coimnission Washington, D. C. _ 20555 Attention: Document Control Desk Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of January, 1984.

Very.truly yours, A k . xe Hal B. teker JAR:ses Attachments cc: Regional Administrator Mr. J. F. Suermann, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region _II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D. C. 20555 Atlanta, Georgia "0303 Mr. Phil Ross INP0 Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C. 20555 Atlanta,' Georgia 30339 Senior Resident Inspector Oconee Nuclear Station 8402210122 840131 PDR ADOCK 05000269 PDR R

\

3

. w OPERATING DATA REPORT DOCKET NO. 50-269 DATE 02-15-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS ~

Ocor.ee No. 1 Notes

1. Unit Name:
2. Reporting Period: January 1. 1984 - January 31. 1984 Year-to-date and cumulative capacity factors are calcu-
3. Licensed Thumal Power OlWt): 2568 lated using a weighted
4. Nameplate Rating (Gross SIWel: 934 average for maximum
s. Design Electrical RatingiNet MWe): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): R99
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net MWe):

None

' 10.' Ressons For Restrictions. If Any:

d This Month Yr..to.Date Cumulative

11. Hours in Reporting Period 744.0 744.0 92 449.0
12. Number Of Hours Reactor Was Critical 744.0 744.0 65 284.6

. 13. Reactor Reserve Shutdown Hours

14. Hours Generator On.Line 744.0 744.0 62 133.4
15. Unit Reserve Shutdown Hours - - -
16. Gross Thermal Energy Generated (MWH) 1 ano n'Ut 1 000 mR 148 207 070
17. Gross Electrical Energy Generated (MWH) 671 260 . _ ,

671 260 51 539 490

18. Net Electrical Energy Genersted (MWH) G42 587 642 587 48 808 138

- 19. Unit Service Factor 100.0 100.0 67.2

20. Unit Availability Factor 100.0 100.0 67.2
21. Unit Capacity Factor IUsing MDC Net) 100.4 100.4 61.2
22. Unit Capacity Factor IUsing DER Net) 97.5 97.5 59.6
23. Unit Forced Outage Rate 0.0 0.0 ~ 17.3-24? Shutdowns Scheduled Over Next 6 Months iType. Date.snd Duration of Each::

Mnno

25. If Shut Down At End Of Report Period. Estimated Date of ',::rtup:

~

26.- Units in Test Status IPrior to Commercial Operstion s: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY

COMMERCIAL OPER ATION e

h

., .. . . _ . . . . . - - - - . , . _ . , -. ~ . - . . - . . - , - , . , - . - . . - . , . - - - , - . - - - , .

ANERAGE D AILY UNIT ?OWER LEY L OCCKET NO.

.50-269 gg7 Oconee 1 D ATE 02-15-84 .

COMPLEHD BY J. A. Reavis TELEPHONE 704-373-7567 310 NTH January, 1984 i

DAY AVERAGE DAILY ?OWER LEVEL DAY AVERAGE DAILY ?OhER :.IVEL Otwe-Neti e5the Net 1 862 866 1 _

1-3 863 g3 865 n _

3 RA3 19 865 4 863 20 865 5 863 865 21 6 864 866 22 7 884 3 866 3 864 24 865 9 864 865 3

10 864 -

865 25 11 864 -

864 12 865 :3 864 g3 865 9 865 g4 846 864 30 i3 865 3i 864 16 865 INSTRUCTICNS Cn t.'.is ICr.""at. list the Der:ge j:lly ;ntt p;wer !d'.et :.1 '.lWe bdt : .'r %*.'. 22. 9 72 40,r :n 2 ; . r t.7 ~ -

e ,
  • he CC3ftlt Ahcic..t p %:t

... **g

- - -,-. .--+.,r -

DOCKET NO. 50-269 UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME Oconee 1 '

DATE 02/15/84 COMPLETED ilY J.A. Reavis ItEPORT MONTil January, 1984 TELEPil0NE 704-373-7567 w.

- E c

, ,5E 3 $5'M Licensee ,E-r, j'a, Canse & Cuirective No. Date i Eg j js5 Event 3,7 e? Action to H y ci! 3 ;p, = Repin te mV uEO Prevent !tecurrence g

O -

1-p 84-01-13 S --

B --

CC VALVEX Control valve movement and stop valve movement test.

l

, a 1 2 1 4 F: Forced Reamn: Method: Exhibis G -Instructions S: Scheduled A-lk luipment Failure (Explain) 1-Manual for Pseparation of D.ita Il Maintenance of Test 2 M.mual Scram. lintry Sheets for I.ieensee C Refueling 1 Automatic Scram. Event Report (LER) File (NilREG-D Itegulatory Restriction 4 Other (Explain) 0161)

E Ope 5ator Training & License Examinati m F Administrative 5 G Opciational-liiror (lixplain) Exhibit I Same Somee i

19/77) Il Other (lixplain)

S n' s Y

- . - - - . . . . . - - - -.=, - - . . . .

- )! -

DOCKET No: 50-269- l

-p Oconee 1 UNIT: -

~

i DATE: 02/15/84 ,

3 .

t NARRATIVE'

SUMMARY

4

-f

-% nth: - January, 1984 i

L 1

-- . Oconee. Unit.1 operated throughout the month at 100% power except for one re-

' duction for a routine surveillenc. test. >

1 8

I

.t i.

3 s

t i

I 4

d 9

if '

4 on f 1

e ,-4 y -w.-, -,...,7.! y. ,e . -e re .-w++vw-w w -r e w m . w- * * = - . - -m = v-wv----e=* w--- -mv-twe~,-- w ~ + e w r=w w w c r er--<e-

MONTHLY REFUELING INFORMATION REQUEST

~1. . Facility name: Oconee Unit 1 ,

2. Scheduled next refueling shutdown: February, 1985 .
3. Scheduled restart following refueling: April, 1985 .
4. . Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision

'f no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

5. Scheduled date(s)/Afor submitting proposed licensing action and supporting information: N ,
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.- Number cf fuel assemblies (a) in the core: 177 .

! (b) in the spent fuel pool: 1123* ,

8. Present licensed fuel pool capacity: 1312 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present l

licensed capacity: .

L February 15, 1984 DUKE POWER COMPANY Date:

l Name of

Contact:

J. A. Reavis Phone: 704-373-7567 l

l

  • Represents the combined total for Units 1 and 2.

I

[.

OPERATING DATA REPORT DOCKET NO. 50-270 DATE 02-15-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name: Oconee No. 2 Note 8
2. Reporting Period: .T - n w 1. 1984 - Janunrv 31. 1984 Year-to-date and cumulative 2568 capacity factors are calcu-
3. Licensed Thermal Power OlWt)-.
4. Nameplate Rating (Gross MWes: 934 average for maximum 5., Design Electricil Rating (Net MWe): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To which Restricted. !f Any (Net MWe): None
10. Reasons For Restrictions. If Any:

This Month Yr. to.Date C'imulative

11. Hours In Reporting Period 744.0 744.0 82 369.0
12. Number Of Hours Reactor Was Critical 744.0 744.0 58 057.5
13. Reactor Reserve Shutdown Hours - - -
14. Hours Generator On Line 744.0 744.0 56 904.2
15. Unit Reserve Shutdown Hours - - -
16. Gross Thermal Energy Generated (MWH) 1 908 854 1 908 854 134 399 521 17 Gross Electrical Energy Generated (MWH) 660 300 , _ ,

660 300 45 765 156

15. Set Electrical Energy Generated (MwH) 633 287 633 287 43 444 856
19. Unit Service Factor 100.0 100.0 69.1
20. Unit Availability Factor 100.0 100.0 69.1
21. Unit Capacity Factor (Using MDC Neti 99.0 99.0 61.1
22. Unit Capacity Factor IU ing DER Net) 96.1 96.1- 59.5
23. Unit Forced Outage Rate 0.0 0.0 16.3 24.. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

None

25. If Shut Down At End Of Report Period. Estimated Date of *.,::rtup:

26, Units in Test Status IPrior to Comr ercial Operations: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER A TION toi- ;

- AVERAGE D AIL't' L* NIT ?OWER LEVEL DCCKET NO.

UNIT oconee 2 0 ATE 02-15-84 _

COMPLEHDBY J. A. Reavis e

TELEPHONE 704-373-7567 310 NTH January. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY ?OwER LEVEL 13tWe-NetI a.\lwe-Neti 1

853 g7 848

853 g3 822 3 853 gg 853 853 4 g 853 5 853  :: 853 6 853 n 852 7 853 853 23 853 3 :4 853 852 853 9 :s 10 851 25 853 gg 852 853 7

g3 852 853 3

13 853 853 39 g4 836 3g 855 j3 853 3; 855 16 853

!NSTRUCTICNS Cn t.ts for=:t. list :he ner:ge 1:tly 2::st :wer 'e.et :n '.thNet :er ese , ::. - ne - ,-- n; : 4 c.. -:.;;e ,

.: nearest .5nele . . pw:::

.o->

' DOCKET NO.- 50-270 UNIT SilUTi! OWNS AND POWER REDUCTIONS UNIT NASIE Oconee 2

'DATE 02/15/84 January, 1984 COMPLETED llY J.A. Reavis REPORT Af0NTil '-

TELEPilONE ' 704-373-7567 e.

- E 7.

-, ,3g 3 $ E5 Licensee ,E r, 1, Cause & Cosrective No. D.it e i 3g i 2sE Event 3,7 {3 9- Action to 8-- y: $ ~ ;f, g Repint a mV SU u

Prevent itecurrence g

O 1-p 84-01-14 S --

B --

CC VALVEX Control valve and stop valve test.

2p 84-01-17 F --

A --

CH XXXXXX 2A FWPT hydraulic oil pressure decrease.

I 2 1 4 F: Forced Iteason: hiettu>ti: Exhibit G Instructions S: Scheiluletl A l!<guipment Failure (Explain) 1-Alanual for Pieparation of Data Il-htaintenance of Test 2-hlanual Scram. lintry Sheets for 1.ieensee C Refueling 1 Automatic Scram. livent Report (LER) File tNtIREG-D Itegulatory Restfiction 4 Other (lixplain) 01bli li Opciator Training & License lixamination F Administrative 5 G Opciational-lieror (lixplain) Exhibit 1 Same Sousee (9/77) Il Other (lixplain) a __--

DOCKET NO: 50-270 UNIT: -Oconee 2 DATE: 02/15/84 NARRATIVE ~

SUMMARY

-Month: January,1984 Oconee Unit-2 operated throughout the month at 100% power except for two short power-. reductions. One for a routine surveillence test, the other to-investigate '

a decrease in hydraulic oil _ pressure on a feedwater pump turbine.

s 4

1

~

MONTHLY REFUELING INFORMATION REQUEST

1. . Facility name: Oconee Unit 2 ,

-2.~- Scheduled next refueling shutdown: June, 1985 ,

3.. Scheduled restart following refueling: August, 1985 ,

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical specification Revision If'no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. -Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

l'

7. Number of fuel assemblier, (a) in the core: 177 .

(b) in the spent fuel pool: 1123* .

5

8. Present licensed fuel pool capacity: 1312 . .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed. capacity.: .

DUKE POWER COMPANY Date: February 15, 1984 ,

4  %' Name of

Contact:

J.-A. Reavis Phone: 7nf1_q72_7 uy

  • Represents the combined total for Unite 1 and 2.

, - - . , , . - . . . , . . . - - , . . - . . , . . - , - - , , , , , . ,_..,s ,.,.._e _,,,n. . - , . , ..._,,,,._.__.n.., . , , , , _ , , , , , , , , _ . . , . , , . _

OPERATING DATA REPORT DOCKET NO. 50-287 DATE 02-15-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS Oconee No. 3 N0t'5

. l. . Unit Name: Year-to-date and cumulatire

2. Reporting Period: January 1, 1984 - January 31, 1984 capacity factors are calcu-2568
3. Licensed Thermal Power OlWt): lated using a weighted
4. Nameplate Rating (Gross MWei: 934 g

. 5.. Design Electrical Rating tNet MWe):

886 dependable capacity.

6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted. If Any (Net MWel:
10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative

!!! Hours In Reporting Period 744.0 744.0 80 016.0 744.0 744.0 _ 57 453.9

12. Number Of Hours Reactor was Critic::1
13. Reactor Reserve Shutdown Hours 14.' Hours Generator On.Line 744.0 744.0 56 326.6
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated'(MWH) 1 909 470 1 909 470 137 402 034 17 Gross Electrical Energy Generated (MWH) 660 170 , _ ,

660 170 47 474 764

13. Set Electrical Eaergy Generated (MWH) .. -633 368 633 368 45 200 486
19. Unit Service Factor 100.0 100.0 70.4
20. Unit Avadability Factor 100.0 100.0 70.4

'99.0 9c).O 65.5

21. Unit Capacity Factor (Using MDC Net
22. Unit Capacity Factor IUsing DER Net) 96.1 96.1 63.8 __

- 23. Unit Forced Outage Rate 0.0 0.0 15.0

24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Eacht Refueling - March, 1984 - 10 Weeks

.y

(

25. If Shut Down At End Of Report Period. Estimated Date of '.,::rtup:
26. Units in Test Status t Prior to Commercial Operation): Forecast Achie$ed INITIA L CRITICALITY INITIAL ELECTRICITY COM 1ERCIAL OPER ATION (spi ~ ~ :

i

-. . . g . . , . , , . . - . . _ , , , , . . , , . , , , . . . , . . . . , - , , - . . , . , - . , , , , - . , . . . , , .

AVERAGE D AILY UNIT ?OhER LEVEL 50-287 OCC.C TSo, LNT _ Oconce 3 D4rg 02-15-84 l COMPLETED BY J. A. Reavis

- TELEPHONE 704-373-7567 a  ;

. MONTH January, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY ?OWER LIVEL (5the Nets i3twe-Nets 857 g. 852 2 858 13 852 i 3 85G g9 852 4 855 . 20 854 5 855 ,g 853 848 853 6 _

n 7 803 ,

3 853 3 853 ;4 _

852 9 8 51 25 853 _

  • 10 846 -

26 853 11 856 -- 852 12 852 3 852 g3 853 ;9 852 14 852 30 853

.13 R53 3g P32 ,

16 _._-

852 INSTRUCTICNS On th:s (crt: st. list me ner:ge J:tly unit r*er :e.e :n WNe Net f.'r e3en :2'. - :,e -:. in f :. c t . ! . u;e .

he c.42 rest .wheie . s p w:tt.

.o - i

DOCKET NO. 50-287 _

UNITSilOTDOWNS ANI) POWER REDUCTIONS UNIT NAME Oconee 3 DATE O2/15/84 COMPLETED BY (.A. Reavis REPORT MONTil Januarv. 1984 El.EPIIONE 704-373-7567 e, 4

-_ E E

-, .! E 3 $ EE  !.icenser E r,

, {% C.mse & Courective No. Date g 3g  %

, .3 s E Event y,T 93 Action in mO uEO H yE ci! Zu ;f, 5 Repini a Prevent Recurrence g

O 1p 84-01-06 S --

B --

CC VALVEX Turbine valve and control rod drives test.

I 2 3 4  !

F: Fenced Reamn: M :ilmd: Exhibit G Instructions S: Scheduled A-Eiguipment, Failure (Explain) I-Manual for Preparation of Data is-Maintenance of Test 2 Manual Scram. lint y Slicets for 1.icensee C. Refueling 1-Automatic Se am. Event Repor (1.ER) File (NilRI.G-D Itegulatory Re:tiiction 4-Other (Explain) 0101)

E-Ope.ator Training & Licenae lixamination F Admindstrative 5 G-Opciatiinial liv ror (lisplain t Exhibit I Same Soinee (9/77) Il Other (lixplaini

... ....,,a _

i

i 1

DOCKET NC: 50-287 UN1T: Ocenee 3 DATE: 02/15/84 NARRATIVE

SUMMARY

Month:- January. 1984' i

Oconee Unit 3 operated throughout the month at 100% power except for a routine i reduction'to perform a periodic test.

r N r e

N

+

5 1

f-4 t

t

- y9 -

, - - . , -- ,-.~1 3., , - , - - - , e-, -, -,c , - , , , - , , - . - - - , , ex,- y--wrm,-,, ,-- , v,w-~ , .,, ,

' ~

MONTHLY REFUELING INFORMATION REQUEST i

'1. Facility name: Oconee Unit 3 ,  ;

2. Scheduled next refueling shutdown: March,:1984 , i
3. Scheduled restart following refueling: May, 1984 ,
4. Will refueling or resumption of operation thereafter require a technical i specification change or other license amendment? Ye4 .

If yes, what will these be? Technical Specification Revision l

If no, has reload design and core configuration been reviewed by Safety Review Comunittee regarding unreviewed safety questions? N/A ,

5. Scheduled date(s) fvr submitting proposed licensing action and supporting a information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in

! design or new operating procedures).

4 177 7.- Number of fuel assemblies (a) in the core: .

(b) in the spent fuel pool: o .

8. Present licensed fuel pool capacity: 825 -

Size of requested or planned increase: .

9. . Projected date of last refueling which can be accommodated by present licensed capacity: . -

DUKE POWER COMPANY Date: February 15, 1984 ,

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

, ._ - _ _ _ _ _ . _ _ .. -. __, _ . - _ _ . _ _ _ . _ , . _ _ _ , . _ . - ~ . _ . - - _ _ _ . . _ - _ . . . . , . .

r OCONEE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of December, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release for December has been compared with the Technical Specifications annual value of 15 curies; the total release for December was less than 10 percent of this limit.

The total station gaseous release for December has been. compared with the derived Technical Specifications annual value of 15,000 curies; the total release for December was less than 10 percent of this limit.