s JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JANUARY, 1984 i
During the month of January, there was one (1) automatic shutdown which occurred on January 9, 1984.
The following safety-related maintenance was performed in the month of January:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced IB waste gas compressor.
3.
Repacked #4 river water pamp.
i 4.
Replaced vacuum pump on radiation monitor R-11.
5.
Replaced' cell #40 on 1A auxiliary building battery bank.
6.
Repaired control circuit on containment spray suction valve 8826B.
t 8402170127 840131 PDR ADOCM 05000348 R-PDR:
m (1
. - _ - - - _ _ _ _ - - - - - - -l DOCTETNO.
50-348 I
UNIT 2/7/8A pgg
\\
W
'. Hairston, III COMPLETED SY..
Tv? cpHONE (205) 899-5156 January, 1984 510NT11 DAY AVEMCE daily POWER LEVEL DAY' AVERAGE DAILY POWER LEVEi.
($1Wc Net)
(51We-Net) 811 805 g,
g7 2
13 801 807 2
19 808 4
- g 806 5
21 Rng 809 6
536 n
7 777 23 807 801 801 g
4 784 J01 9
25' 10 0
26 804 O
804 II 77 0
806 12
- 3 13 288
- 9 808 776 08 14 30 15 804 810 3g 16 805 l
l
!? G U G O N S On 'his form::.list the sve.,ge daily umt power levelin MWe Net for e:ch 67 n the reporting munth. Gmpute to i
, the neare:t whole mepwat.
(9(77) i I
.1
o i
f i
i OPERATING DATA REPORT DOCKET NO 50-348 i
DATE 2/7/Rd COMPLETED BY W.G.Hairston, III TELEPHONE (?ns m og_s156 i
OPERATING STATUS f
Josaph M. Farley - Unit 1 Notes g, y,g, %
- 2. Reporting reded:
January. 1984
- 1) Cumulative data since 12/1/77, date of i
- 3. Licensed Thermal Power (MWt):
W7 commercial operation.
- 4. Namepiste Rating (Gross MWe):
860 829 i
- 5. Deng, Electrual Rating (Net MWe):
844.6
[
- 6. Maximum Dependable Capacity (Gross MWe):
803.6 l
- 7. Maximum Dependeble Capacity (Net Mbe):
- 8. If Changes Occur irt Capacity Rating: (Items Number 3 Through 7) Since.Last Report. 'iive Reasons:
w /a f
- 9. Power Level To Wluch Restricted,1f Any (Net MWe):
w/A l
- 10. Reasons For Restdctions.If Any:
N/A i
l This Month Yr to.Date Cumulative l
I II. Hours in Reporting Period 744 744 54.072 698.0 698.0 35,821.2
- 12. Number Of Hours Reactor Was Critical
- 13. Reactar Reserve Shutdown Hours 0.0 0.0 3,650.7 r
664.5 664.5 34,767.9 l
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0
. 0
- 16. Grom Thermal Energy Generated (htWH) 1,729,356 1,729,356 87,830,882 l
- 17. Grom Electrical Energy Generated (MWH) 548,662
' _548,662 27,891,672 l
- 18. N;t Electrical Energy Generated (MWH) 518,276 518,276 26,219,338 l
- 19. Unit Sersice Factor 89.3 89.3 64.3 l
- 20. Unit Availab3ity Factor 89.3 89.3 64.3 86.7 86.7 60.3
- 21. Unit Capacity Factor (Using MDC Net) 84.0 84.0 58.5 j
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 10.7 10.7 lu l
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eachi:
Refueling / maintenance outage 2/1C/84. approximate 1v 8 ve.h.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
N/A I
- 26. Uniti In Test Status (Prior to Commercial Operation):
Forecast Achieved
..Ni7i4 L CRl7iCALITY 8/6/77 8/9/77 8/20/77
~8/18/77 INITIAL ELECTRICITY COMMERCIAL OPERATION 12/1/77 12/1/77 i
l (o -
l I
UNIT SlHITDOhNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAklE J.M. Farley-Unit 1 DATE 2/7/84 COhlPLETEI) BY W. G. Hairston, III REPORT hf0 Nill _ January,1984 TEl.LPilONE (205) 899-5156 I
=
a
.E E 3
jE'j g-]1, Lkensee E r, cause a cuiveceive No.
Date
(
il g E 5 a:
Event gy a
Auton in
$E 5 i j ig g Repori
- Pievent Recurrence F
mt>
6 001 840106 F
0 h
4 NA ID TRB Reduced power to 30% to repair main turbine bearing oil leak.
002 840109 F
79.5 A
3 84-001-00 SL P
Rx trip due to 10-10 level in IB S/G following 1A SGFP trip.
I i
l 2
3 4
F: 1:osted Reason:
hiethod:
Exhibit G Insienctions S: Stheiluted A 1quipment Failure (Emplain)
I hianual for Picparation of Data 11 klaintenance ni Test 2 hla.uul Scram.
Entry Sheels for I.iienwe C RcIncling
- 3. Autonulx Scrans.
Esent Reposi(1.1 R) lite INtlREG.
D llegulatiny Hestrittion 4 Othes (limplaisi) 0161I l..Orcoator 1eaining & license T.mamination i
F-Administrative '
5 G Opreatienal 1.ssur (Enplain) thhibis I. S.une Sousic (9/77)
II Olhes (17uplain) i l
A ~
Malling Address Alabama Power Company 6rh Ncrth 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Tolephone 205 783-6081 F. L Clayton, Jr.
Senior Vice President
)
Flintndge Building AlabamaPower 1
the southem electnc system February 10, 1984 Docket No. 50-348 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington,Q.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the January,1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, l
. L. Clayto, Jr.
FLCJr/KWM: sam Enclosures xc: Mr. Ted Cintula (1 copy)