Notice of Issuance of Amend 6 to CPPR-135 & CPPR-136
ML20086M283
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 01/27/1984
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20086M278 List:
References
NUDOCS 8402160485
Download: ML20086M283 (3)


Text

,

I UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-443 AND 50-444 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE, ET. AL.

SEABROOK STATION, UNITS 1 AND 2 NOTICE OF ISSUANCE OF AMENDMENTS TO CONSTRUCTION PERMITS Notice is hereby given that the U. S. Nuclear Regulatory Commission (the Commission) has issued Amendments No.

to Construction Permit Nos. CPPR-135 and CPPR-136. The amendments add Vermont Electric Generating and Transmission Cooperative, Inc. as a co-owner of tne Seabrook Station, Units 1 and 2 and reflect a transfer of ownership interest from Vermont-Electric Cooperative, Inc. to Vermont Electric Generating and Transmission, Inc. for the Seabrook Station. The Seabrook Station is located in Rockingham County, New Hampshire.

The amendments are effective as of their date of issuance.

The application for the amendments complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter 1, which

'are set forth in the amendments. The Commission has also concluded that the amendments involve ections which are insignificant from the standpoint of environmental impact and that, pursuant to 10 CFR Section 51.5(d)(4), an environmental impact statement or negative declaration and an environmental impact appraisal need not be prepared in connection with the issuance of the l

amendments. Prior public notice of the amendments was not required since the

(

amendments do not involve a significant hazards consideration.

PDR

For further details with respect'to this action, see (1) the application for amendments, dated October 17, 1983 (2) Amendments No.6 to Construction Permit Nos. CPPR-135 and CPPR-136 and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection in the Commission's Public Document Room, 1717 H Street, N.W., Washington, D. C., and at the Exeter Public Library, Front Street, Exeter, New Hampshire 03833.

Itens 2 and 3 may be requested by writi.19 to the U. S. Nuclear Regulatory Conr11ssion, Washington, D. C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 2Mday of January,1984.

FOR THE NUCLEAR REGULATORY COMMISSION Griginal ti,r Al Vj:

Sectgc W. K.q,'t.a George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing I

)

k

Tei, T! "

03%

uur EMMn 1/[f84 1/p/84 1/ b4 1//2/84

-g.

January 27 1984 0

I ISSUANCE OF AMENDMENTS TO CONSTRUCTION PERMITS FOR SEABROOK STATION, UNITS 1 & 2 OISTRIBUTION:

taeument.wCentvola(60-443/444)

NRC PDR Local PDR PRC System NSIC i

LB#3 Reading J. Lee (5)

V. Nerses T. Novak i

J. Saltzman, SAB OELD, Attorney C. Miles H. Denton J. Rutberg A. Toalston J. Taylor E. Jordan L. Harmon D. Brinkman, SSPB T. Barnhart (8) l

\\

l i.

l l

[

L

.. ~

..