ENCLOSURE 4 V0GTLE ELECTRIC CENERATING PLANT - UNITS 1 AND 2 HONTHLY OPERATING REPORT FOR OCTOBER 1991 TABLE Of CONiltill Operating Data Report Page VI-2 9112170236 911211 PDR-ADOCK O'3000424 R-PDR
j s
CPERATING DATA REPORT DOCKETNO 50-424 l
DATE:
DECEMBER 5.1991 COMPLETED BY: G. L HOOPER TELEPHONE:
(404) 826.-4104 j
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD: '
OCTOBER 1991
+
3.UCENSEC THERMALPOWER(MWt):
3411
- 4. NAMEPLATE RATING (GROSS MWo):
1215 t
S. DESIG.'l ELECTHCAL DATING (NET MWe):
1101
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1154
- 7. MAXIMUM DEPEND /BW CAPACITY (NET MWe):
1100
- 8. lF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
j
- 9. POWER LEVELTO WHICH RESTRICTED,IF ANY (NET MWo):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTIOtl,:r ANY:
N/A r
THIS MONTH YR.TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745 7296 38737
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
0.0 6167.6 32626.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 j
- 14. HOURS GENERATOR ON-UNE:
0.0 6167.6 L1921.9
'L
- 15. UNIT RESERVE SHUTDOWN HOUP/3:
0.0 0
0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
0 20711809 105905420 e
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
0 6978890 35273340 s
- 18. NET ELEC. ENERGY GENERATED (MWH):
-3880 l 66578601 33419770 l
- 19. REACTOR SERVICE FACTOR 0.0%
84.5 %
84.2 %
- 20. REACTOR AVNLABluTY FACTOR 0.0%
84.5 %
84.2%
- 21. UNIT SERVICE FACTOR:
0.0%
84.5%
82.4%
- 22. UNIT AVNLASluTY FACTOR:
0.0%
84.5 %
B2.4%
23.' UNIT CAPACITY FACTOR (USING MDC NET):
-0.5%
83.0 %
79.6%
- 24. UNIT CAPACITY FACTOR (USING DER NET):
-0.5%
82.9%
78.4 %
_i 25, UNIT FORCED OUTAGE RATE:
0.0%
0.0%
7.3%_
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE. AND DURAllON OF EACH)
REFUEUNG - SEPTEMBER 15,1931 - 66 DAYS i
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NOV. 20,1991 -