i OfEFAT!kG [A1A RF0-e D Et !n %-97 Ulf De:rgb 13. }iH C1EHTIN3STATU3 COMPLETED M R A, Wilbers TELEF C E 704-373-5961
- 1. Unit hate: M:64tre 1 2, feprttrg f eriod: Ncaeaber 1, 1991 Novetter 30, 1971 3, licensed itersal f cser (Nth 3411
- 4. Mneplate f ating (5rtst M=eh 13054 Nstes INaseplate Katiry
- 5. Design flectrical Eattrq (9et Neh 1180 (Brcss f/me) calculated as
- 6. Paviaus DeperMable Capacity @ css Wei: 1171 1450J00 MVA > .9) pe=er
- 7. Natious Lepencable Capcity (Net Neh 11Ei , factor per Fage iii, -
- 5. If Changes Occur in Gncity Ratings (ltets Nasber 3 Througt 7) Sirce Last l NURE6-0020.
Esport. Give Reasonsi I d
- 9. fc.er Level Ic M ich Restricted, if Ary (het M4):
- 10. Reisen For Restrictices, if any This Nanth it.-to-Date Cutulatise 1
- 11. Mars Iti Reprtir,; Period 720.0 B013.0 E7648,0 12, Hueter Of Hus Reactor Was Critical 0,0 5767.2 61433.1 13 Fenter Reserve Smtewn Mrs --0-- 14. M urs Seaerator Oa-Line 0,0 575!J 6077!.0
- 15. Unit Reserve Shutd:wa Hcurs +-0-- - -
- 16. Gross Theraa! Er.ergy Eererated ( M ) 0 19:039H 155419561 -
- 17. Eccss Ele:tri:al Energy Generated ( M ) 0 6605156 63227591
- 12. Net Ele:trical Ener;y S e erated ( M ) -4707 633759? 60926075
- 19. Unit Service fa:ter 0.0 71.0 69.'3
- 20. Unit Availability Factor 0.0 71.9 67.3 E1. Unit Capacity Facter (Using NLC het) 0.0 70.0 00.2
'22. Urdt Captity f acter (Using I'ER Net) 0.0 67.0 52.9
- 23. Unit Force: Outage Pate 0,0 8.6 12,5
- 24. 5%tdan Sctedoled 0ser Next 6 Menths (Typ, Date, and Daration of Etchh Currently Refuelino ,
- 25. If Shut Ccn At End Ofier port Feried. Esticated hte 7f Startup: December 10, 1991 E6. Units in Test Status (Prict to Ccssercial Operation): Forecast A:hleved litlTIT.L CRlifCAtliY INITIAL ELECTRICITY CC N RCIAL 0 ERAi10N __
l l
1 911.2170014 911.Ji3 POR ADOW 0D000269 R PDR
_m , . _ . _ . _ _ _ _ . _ . _ _ .
\:_a 1
- y ,
-.-. ,.y
- WikATINS DATA REPORI-r --,.
'l DOCTE) N0 _ 50*369 UNil M 6uire 1 ,
DATE Deteater 13,1991 COMPLETEDBY R.A. Willi m TELEFHONE. 704 373-5907 hCNTH , kevnter,1991 I E 'AVERASE DAILY P0nER LEVEL- DAl
. AVERASE DAILY POWER LEVEL (MWe-het)- (Me-het) 4 1- -0 17 0 A.
12., 0 10 0 ,
-3 0 19 0-l
-4 0 20 0 _
5 0-_ 21 0
+ 0 ee 0 _
i7-_ ~~ o 23 0-
, B 0 0 j- 0~ - 25 0-k <!Pi 0 26 0-g, 11- 0 27 0 _
L i2 - o 28 - -O-
-13 'O - 29' 0 ,
-H i .
0 30 0 If - n
-- 3 -3 o
8 e
e, .+ , 5..w._.,.mmy, - g
NNIT SHUTDOWNS AND POWER' REDUCTIONS DOCKET NO. 50-369 . ^
UNIT NAME Musu 1Et, 1
- INVrE 12/13/91
-REPORT MONTH- November 1991- COMPLETED BY s. w. M u s t.x .
l TELEPHONE t/va)-a/3-didz-i.
(1) 2) _
(4) (5) ,
i E HOD T' A OF. . LICENSE' l N Y S SHUT EVENT. SYS- CAUSE AND CORRECTIVE l O .P DURATION. O DOWN REPCRT TEM COMPONENT- -
ACTION TO
. DATE E HOURS N R/X NO. CODE CODE' PREVENT RECURRENCE 5 91 l S- 720.00 C 1- RC 'FUELXX END-OF-CYCLE '7' REFUELING OUTAGE i
I (1)F Forced (2)Reason- (3) (4)
Method: Exhibit G - Instructions.
S Scheduled A-Equi ment Failure-(Explain) 1-Manual for Preparation of, Data E-Main enance or test
.C-Refueling 2-Manual Scram 3-Automatic Scram Enty Sneets For Licensee Evenu Re ort D-Regulaton Restriction 4-Other (Explain) File (NUkEG-01'LER)61)
E-Operator Training'6. License Examination F-Administrative (5 G-Operator Error (Explain) xhibit I - Same Source-H-Other (Explain)
.A .
4 DOCKET NO: 50-369 UNIT: McCulte 1 Dart: 12/13/91 NARRATIVE
SUMMARY
MONTil: November 1991 McGuire Unit 1 began the inonth of November shut down for its end of-cycle '7' refueling outage. The unit rernained in the outage as of the end of the month.
l Prepared by: S. W. Moser Telephone. 704-373-5762
e .
MONTHLY __ REFUELING INFORMATION REQUEST
.1. Facility name: McGuire. Unit 1 2.-- Scheduled _next-refueling shutdown: Current 1v Refueling
- 3.-
Scheduled restart following refueling: Decepber 1921 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF
.ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, . QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a i technical specification change or other license amendment?
l If _.yes , what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety' questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
e
- 6. Important- licensing considerations (now or different design or supplier, unreviewed design or performanco analysis methods,
, significant changes'in design or new operating procedures).
, _7 . Number of Fuel assemblies -(a) .in the coro: 192 (b) in the spent fuel pool: 119
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9_ . .. Proj ected date of last refueling which can be accommodated by_
present licensed capacity: March 2006***
. DUKE POWER COMPANY DATE: December 13. 1991 Name-of
Contact:
R. A. ~ Williams Phone: 704-373-5987
., - . - . - - -- . - - . . . . . - ~ . . ~ . - . - - - . - . _ - . .
X .._
l
. 0PERAllhB DATA FEPDRI 00CLEi N0 50-370 CATE fecest'er 13. 1991 0FEMTING STATUS COMPLETED BY R.A. Williaes ,
TELEPHONE 704-373-5987
- l. Unit Name: M: Suite 2 -
' 2, Reprting Feriod: Novester 1,1991-kavester 30,1991
. 3. Licensed Thereal Power (Mt):
. '4411
- 4. haarplate Rating J6tess NWeh- 13051 Notes *Neteplate Rating
- 5. Design Electrical Rating (Net MWelt . !!B0 (6tess MWe) talculated as
- 6. Masina Dependable _ Capacity (5ross MWeh - 1171 1450.000 MA a .90 peer
- 7. Marista Dependatte Capacity (Net MWe): 1129- f acter per f age lii,
- 9. If Changes Occur in Capacity Rattogs _(! tees kater 3 Thrcugh 7) Since Last NURES-0020.
Report. Give Reasonst
-9. Power Level To Which Restricted, If Ary thet MWell_
- 10. Reanen for hestrictiens, if acy:
~
~~
_This Mcnth Yr..-to-Date Cuaulative
- 11. Ho.irt In fieprting Period 720.0 6016.0 679% 0
- 12. Number-of Fours Reactor Was Critical 630.3 7817.3 52457.4
[' _13,'_ Reactor Reserve Shutdcan Hours - - --0--
- 14. Hours Senerator Dn-Line 677.8 7006.2 51609.9 ,
T15. Unit Rearve Shutdevn Hours ~ - --0-- --0--
'16 Gross Thetsal Energy Generated (MWH) 2185092- 25911049 168515S40
- 17. Gress Electrical' Energy Generated (MWH) _769991 901559? 599H793
'18. Net Electrical Entrgy Senerated (6 0.- 737515 9663347 5652?793 ,
- 19.' Unit service Factor- 94.1 97.4 76.0 120.UnitAvallabilityFactor .
94.1 97.4 76.0-
- 21. Unit Capacity Facter (Using NDC Net} 90.7 95.7 72.6-G 22. Dait Capacity Factor JUsing DER Net) 56.5 91.6 70.5 '
. t23.UnitforcedDutageRats 5.9 2.6' 8.2
. 24. Shutdon Scheduled Over Next 6 enths (Type, Date, and Duration of Each):
Refueling - January.9, 1992, 65 Days-25.;1f Shut Ocun At Ed Of Repcrt Ferica. Esttaated Date of Startup: _ . , , , _
- E6. Units In Test Status (Frier.to Ccasercial-Operaticnit-
-_ Forecast _. Adleved INITIAL CRIT!Ca'1TY .
INITIALELECTRICITY- '_
1 COMMERCIAL GFERAilGN
...:. .:.. . - - - . - . - . . . - .n - .. - -- , -
n j-p- ,
.. OP!RAllNSSATAREFORI >
00CtET NO 5 & 370 l!N!I PchitL2 DATE Ltrepht 13.1%L
- CCMPLETED SY_ R. A. Willian$ '.
TELEPlicht 704T3:11gl_, .
i 1 MONTH November.1H1 L41 AVEMBE DAILY POWER LEVEL RA1 AYERASEDAllYFOWERLEVEL (MWe-Net! MWe Net) ,
l1 . !!42 _ . 17 _
1149
- 1 P 2- 1141' 19 1131
-? 1142 19 t143 4 1142 20 - 1149 'l j
, -5 .JB3 21 !!69
- i 6 1140 22 1149 j 4:
a j E ? -- _- 1140: 2.1 : 1150 4
G- p3 _.
24 ,'1065 9' :0. 25- %3
- 4 .
- 10-1 -544- *'*
26 837 . i s...- .9
.qt i; 11 ': -
-1147 27 . Ilil z 12 - - _ _ 11B7 _ _ - -28L 1126
'b -1137 29- 1148 13 -:
e '1113
[ -if -
30 1149-( _a ,
k +
- . :- 15 , 1149
. ' 16 -' 119) di
[,',-
1
('.
l 1,
- -. - , , - - . , . - , . . , , ,,, a , i,..... ,n, 4 e c , n '.,..,
, - __ . _ . . . . . . . . , _ - - - - - _ . . . ._ - _ . - . . . - _ - - . . _ . . . ~ . - . . - . . . . ..
-.._...m.._.__._........_.. .
-4
^
UNIT SHUTDOWNS AND' POWER REDUCTIONS DOCKET'NO. '30-370- . - -
N UNIT NAME Mut>u i Art.
. . .DATE 12/11 91
' REPORT,-MONTH November 1991 COMPLETED BY= s . V . 4~Most.x .
TELEPHONE (/U6)->/J->/be-(1) (2) (3); (4) (5)
R MET-
- E HOD T A OF ~~ LICENSE
-N- Y- S SHUT EVENT . SYS- CAUSE AND CORRECTIVE OL P DURATION O DOWN REPORT ! TEM COMPONENT ACTION TO
.- DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 4 91 11 F. -42.22 A I.3 RB CONROD' ' REACTOR TRIP - CONTROL ROD SHUTDOWN i BANK DROPPD INTO CORE DURING TESTING .
24-P 91-11-25 S --
A --
IA PIPEXX '2B' STEAM GENERATOR LEVEL-INSTRUMENTATION FITTING LEAK ,
25-P 91-11-25 S --
H --
CH PUMPXX PLACINGA' FEEDWATER PUMP'IN SERVICE
'26-P 91-11-25 F --
H --
RC FUELXX AXIAL FLUX DIFFERENTIAL PROBLEMS :
'27-P 91-11-25 P --
H --
RC- FUELXX AXIAL FLUX DIFFERENTIAL PROBLEMS .
(1)F Forced (2) (3)
- (4)
Reason- . Method: Exhibit G - Instructions -;
S Schedu. led A-Equi ment Failure (Explain) 1-Manual for Prem ration of, Data-B-Main enance or test 2-Manual Scram Entn- Sheets For Licensee C-Refuelina . 3-Automatic Scram Event Report (LER D-Regulator ~'y Restriction 4-Other (Explain) File _ (NUREG-Ol61) )
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain) Exhibit I - Same Source
, H-Other (Explain) o
, t - , , ,- m - + -. , a
DOCKET NO: 50 370 UNIT; McGuire 2 DATE: 12/13/91 NARRATIVE
SUMMARY
MONT11: November 1991 McGuire Unit 2 began the month of November operating at 100% full power.
The unit operated at or near 100% full power until 1143 on 11/08, when a reactor trip occurred due to control rod shutdown bank 'C' dropping into the coro during a control rod movement test. The unit returned on line at 0.556 on 11/10 and reached 100% full power at 2235 cn 11/10.
The unit then operated at or near 100% full power until 1750 on 11/24, when a power reduction was commenced due to a steam generator level instrumentation fi tting leak. The unit reached 14% power at 0349 on 11/25 and was held there until 0612 on 11/25. At this time, a load increase was begun. The increase was secured at 40% power from 0808 to 0905 on 11/25 to place feedwater pump 'A' in service. The next holds were at 48% power from 1055 to 1957 on 11/25 and at approximate 1v 52%
power from 2255 on l'/25 to 0538 on 11/26 both due to axial flux differential proble s. The unit was returned to 100% tull power at 2038 on 11/26, and -perated at or near 100% full power for the remainder of the month.
Prepared by: S. W. Moser Telephonet 704-373-5762 i
m ~. .-. _._______._ ___._____ _ _ _ _ _
4-4 MONTHLY REFUELING IN FORMr1TLOfLAEQUES_T
- 1. Facility name: McGuire, Unit 2
- 2. Scheduled next refueling shutdown:_.lanuary 1922
, 3. Scheduled restart following refueling: March 19_22 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification cnange or other license amendment?
If yes, what will those be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important li'.:ensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fucl assemblies (a) in the core: 193 (b) in the spent fuel pool: 665
- 8. Present licensed fuel pool capacity: Ift_61 Size of requested or planned increase: ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: December 20n* **
DUKE POWER COMPANY DATE: pac _nmber__ IL 19cL1 1
Name of
Contact:
}1. A. Wi1Liam;i Phone: 704-373-5.232_
j.