Text
,CCN # S I-14 210,
46
]
PillLADELPIIIA ELECTRIC COMPANY J
PrACll IKnTOM ATUMIC POWih sTAllON Thf
--',/
R. D 1, Ikn 20H Delu, lttituylvani. 17316 ro o mcntms-ruarownauttactnewca (717) 4 % -701-4 D. B. Miller, Jr.
Vice President December 13, 1991 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUlllECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1991 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely,)
e r h4
<.A W r;[h DM k
I DBM/AAF/T3N/Di1M/M3B: cmc
~
Enclosure cc:
R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania JJ. Lyash, USNRC Senior Resident Inspector R.I. Mclean, State of Maryland T.T. Martin, Administrator, Region I, USNRC H.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power INPO Records Center CC1191.NRC g'111170006 911130 a.,lp" ApotK U3OOU,77
.g h
///
i-
- bec:
J.A. Basilio J.W. Durham -
D.R. Meyers R.R. Corse A.A. Fulvio TJ. Niessen D.A. Cartwright - _
K.R. Graff PBNR (331)
Commitment Coordinator D.R. I telwig K.P. Powers Correspondence Control Desk AJ. Marie EJ. Cullen-C.J. McDermott i
L CC1191.NRC
NRC ?.lonthly O wrations Summary l
Prach llottom Atomic Power Station November 1991 UhlT 2 Unit 2 began the month at nominal 100% power. On November 2, a load drop was taken for a control rod pattern adjustment. Power was restored to 100% within three hours. On November 27, Imwer was reduced to 80% to allow for scram timing of 19 contr*31 rods. Unit 2 returned to 100% power later that day and remained at nominal 100% through the end of the month.
UNIT 3 Unit 3 was shut down for the entire month with refueling outage activities in progress.
l l
cciiet. sac
Docket No. 50-277 Attachment to Monthly Operating Report for Novemler 1991
}1 NIT 2 ItITUEllS11 thl'OllllAl[QS 1.
Name of facility:
Peach Ilottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 9 scheduled for September 5,1992.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 20,1992.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
No.
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A CC1191.NRC
4 DocLet No. 50-277 Attachment to Monthly Operating Report for November 1991 Page 2 tiNIT 2 RI: FUEL.ING INI'ORM ATION (Continued) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core 764 Fuel Assemblics (b)
Fuct Pool 1896 Fuel Assemblics,58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been regt:csted or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last ecfueling that can be discharged to the spent fuel pool assuming the present capa:ity:
September 2003 without tull co ; mfload capability.
September 1997 with full cort offload capability, p.
i b
CC1191.NRC
Decket No. 50-278 Attachment to hionth!y Operating Report for November 1991 UNIT 3 HEl'UI't.ING ELOMjMlQM 1.
Name of facility:
Pes,.h 130ttom Unit 3 2.
Scheduled date fcr next refueling shutdoww Reload 8 in progress
.t 3.
Scheduled date for restart following refueling Restart followiag refueling scheduwa iw December '.5,1991 4.
Will refucting or resumption of opere: ion thereafter require a technical specifi.ation change or other license amendmem /
See item 6.
If answer is yes, what, in general, will these be?
See item o.
5.
Scheduled date(s) for submitting proposed licensing action and supimrting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design on performance analysis methods, significant changes in fuel design, new operating procedures:
Technical specification amendment on reactor vessel pressure temperat ure limits prior to startup for cycle 9 was approved (,/27/91. (Technical Specification Change Request 9tbl7)
CCit91 N1C
Docket No. 50-278 Attachment to Monthly Operating Report for Novernber 1991 Page 2 s -,
UNIT 3 REFUEL.ING INFORMATIOS (Continued) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage g,ool:
(a)
Core - 768 Fuel Assemblics (b)
Fuel Pool 1689 Fuel Assemblies,6 Fuel Rods 8.
The present licensed spent fuel puoi storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in nun,ber of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel anemblics.
9.
The projected date of the last refueling th;.t can be discharged to the spent fuel pool assuming the present capacity:
September 2004 without full core ofuoad capability.
September 1998 with full core ofDoad capability.
CC119t.NRC
+
b AVERAGE DAILY UNIT POWER p. VEL DOCKET No. 50 277 UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 15, 1991 COsPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS CROUP PEACM BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 MONTH NOVEMSER 1991 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE* NET) 1 1067 17 1066 2
'1054 18 1061
~ 3 1062 19 1066 4
1058 20 1054 5
1062 21 1066
'6 1058 22 1970
-7 1066 23 1066 8
.1058-24 1062 9
1057 25 1062 10 1066(
26 1067-
. 11 1063 27 1010 12 1062 28 1058 -
13 1D65 29 1049 14 1065 30 1066
-15 1066 16-1054 t
i.
l l.
I
AVERACE DAILY UNIT POWER LEVEL DOCKET No. 50 - 278 UNIT FEACH BOTTOM UNIT 3 CATE DECEMBER 15, 1991 COMPAhY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORiS CROUP PE ACH B0170H ATOMIC PWER St ATION TELEPHONE (717) 456 7014 Ext. 3321 MONTH NOVEMBER 1991 DAY AVERACE DAILY POWER LEVIL DAY AVERACE DAILY POWER LEVEL (mlE NET)
(HWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
s 12 0
20 0
13 0
29 0
14 0
30 0
15 0
16 0
OPERATlhG DATA REPORT DOCKET WO. 50 277 DATE DECEMBER 15, 1991 COMPLETED BY PHILt3ELCHI A ELECTRIC COMPANY M. J. BARok
$UPERVlbOR REPORTS GROUP PEACH BOTTCM A!OMIC POWER STA110N TELEPHONE (717) 456 7014 EXT. 3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD: NOVEMBER, 1991
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. hAMEPLATE RATING (CROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1D65
- 6. KAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (kET MWE):
1055
- 8. !F CHANGES OCCUR IN CAPACITY RATINGS (ITEMS WUMBER 3 THROUGM 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (hET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THl3 MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD T20 8,016 152,592
- 12. RUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,081.7 91,782.*
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GiNERATDR ON LINE 720.6 4,838.1 B8,423.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWM) 2,354,304 14,819,928 261,236,961
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 787,800
- 4,847,100 85,855,390
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 763,302 4,646,524 82,201,170 PACE 1 0F 2
c.
1 OPERAlths DATA REPORT (CONilWUED)
DOCKET ho. 50 - 277 DATE DECEMBER 15, 1991 fHis HohTH YR f0 DATE CUMULA11VE
- 19. UNIT SERVICE FACfDR 100.0 60.4 57.9
- 20. UNIT AVAILABILITY FACfDR 100.0 60.4 57.9
- 21. UNIT CAPAtl1T I ACIDR (USING MCC NET) 100.5 54.9 51.1
- 22. UwlT CAPACITY FACTOR (USING DER NET) 99.5 54.4 50.6
- 23. UWlf FDACED DUTACE RATE 0.0 14.6 14.4
- 24. SHUTDovk$ SCHEDULED DVER NEXT 6 MOsTHS (!YFE, DATE, AND DURA 110N OF 5.ACM):
- 25. IT SHUTDOWN AT END OF REPORT PERIOD, ESilMATED DATE OF STARTUP: N/A
- 26. UNIIS IN 15ST STATUS (PRID* TO COMMERCIAL OPERAfl0N):
FDRECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/10/74 COMMERCI AL OPERATION 07/05/74 PAGE 2 0F 2
,,~~c--
y p
OPERATING OATA REPORT I
DOCKET No. 50 278
]
DATE DECEMBER 15, 1991 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP P( ACH BOTTOM ATOMIC PWER STATION TELEPHONE (717) 456 7014 EXT 3321 OPERATINJ STATUS
- 1. UNIT NAME: PEACH SOTTOM UNIT 3 NOTES:
2, REFORTING PERIOD _ NOVEMBER, 1991
- 3. LICENTED THERMAL POWER (MWT):
3293
- 4. hAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1D65
- 6. KAXIMUM DEPENDABLE CAPAtl1Y (GROSS MWE); 1D98 '
- 7. KAXIMJ4 DEPENDABLE CAPACITY (NET MWE):
1035
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SikCE LAS1 REPORT, GIVE REA00NS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (NET MWF):
- 10. REASONS FOR RESTRICTIONS, if ANY:
Thl$ MONTH YR TO-DATE Q MULATIVE
- 11. HOUR $ IN REPORTING PERIOD.
720 8,016 148,488 12.. NUMBER OF HOURS REACTOR WAS CFITICAL 0
5,359.2 90,362.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS CENERATOR DN LINE 0.0-5,214.4 37,305.0-
- 15. b41T RESERVE SHUTDOWW HOURS 0.0 0.0 0.0 16._ GROSS THERMAL ENERGY GENERATED (MWH) 0 16,241,424 256,093,930
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 5.327,000 84,002,532 18 NET ELECTRitAL ENERGT GENERATED (MWH)
+2,498 5,112,247 80,488,919 PAGE 1 0F 2 4
1 c
OPERA'ING DAT A REPC'RI (CONTINUED)
DOCKET No. 50 - 278 DATE DICEMBER 15, 1991 THIS MONTH YR 10 DATE CUMULATIVE
- 19. UNil $ERVICE F ACIDR 0.0 65.0
$8.8
- 20. Uhli AVAILABILITY FACTOR 0.0 65.0 58.8
- 21. UWli CAPACITY FAC10F (USING m c hET) 0.0 61.6 52.4
- 22. UNil CAFACITY FACTOR (U$1NG DER WET) 0.0 59.9 50.9
- 23. UN11 FORCED OUTAGE RATE 0.0 15.1 12.7
- 24. SHU'.~. "a P F.EDULED DVER LEXT 6 MONTHS (f YPE, DATF, AND DUR A110N OF EACH):
- 25. IF $HUIDOWN AT END 0F R(PORT PERIOD, E511kATED DATE OF STARTUP: N/A
- 26. UW115 IN TEbf STATUS (PRIOR 10 COMMERCI AL OPERATION)t FORECASI ACHIEVED INITIAL CRITICALITY Of/07/74 IWITIAL CLEC1RIClfY 09/01/74 COMMEACIAL OPERATION 12/23/74 PACE 2 0F 2 I
4 UNIT SHUTDUWNS AND POWER REDUCil0NS DOCKE1 NO 50 277 UNIT NAME PEACH BoiTOM UNIT 2 DATE DECEMBER 15, 1991 REPORY MONIN NOVEMBER, 1991 COtPLETED ST PHILADELPHI A ELECTRIC CtMPANT M. J. BARON SUPERVISOR c
REPOR1$ CROUP PEACH DOTTOM ATOMIC POWEP STATION TELEPMDNE (717) 456 7014 EXI. 3321
?
METROD OF LICENSEE STSTEM COMPONENT CAU$E AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN (VENT CODE CODE ACTION 10 NO.
DATE (1)
(HOUR $)
(2)
REACf0R (3)
REPORT #
(4)
(5)
PREVENT RECUNRENCE i
I 21 911102 S
0.0 N
4 N/A R8 CONR00 00NTROL R00 PATTERN ADJUSTMENT 3
REACTOR VA$ N01 $ HUT DOWN 23 911127 5
0.0 H
4 N/A 4B CONR00 SCRAM TIMING & CON 7 COL ROD PATIERN AD.IUS1 MENT REACTOR WAS NOT SHUT DOWN 6
(1)
(2)
(3)
(4)
- F
- FORCED REASON HETH00 EXHIBli G lWSTRUCTIONS B. SCtlEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL TOR PREPARATION OF 07TA b. MAINTENANCE OR TEST 2. MANUAL SCRAM.
ENTRT SHEETS FOR LICENSEE C - REFUEL!kG 3 ALITOMATIC SCRAM.
EVENT REPORT (LER)
D. REGULATORT kESTRICilON 4. OTHER (EXPLAIN) flLE (NUREC-0161)
E. OPERATOR TRAINING + LICENSE EXAMINATION '
F ADMihlSTRATIVE (5)
G. OPERATIONAL ERROR (EXPLAIN)
M. OTHER(EXPLAIN)
EXHIBli !
- SAME SOURCE J
9 e-
{
UNii SHUIDOWWd AND POWER REDUCTIOES DOCKET No. 50
- 278 UNil NAME PEACH 00ff0M UN11 3 DATE DECEMBER 15, 1991 REPORT MONTH NOVEMBER, 1991 COMPLETED BT PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERV150R REPORTS CROUP PE ACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 3321 MEih00 OF LICENSEE SYETEM COMPONENT CAUSE AND CORRECTIVE TTPE DURAtl0N REASON SWJ' TING DOWN EVENT CODE C00E AC110N 10 NO.
DATE (1).
(HOURS)] (2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 16 911101-S 720.0 C-1 N/A ZZ ZZZZZZ PLANHCD kEFUELING OUTAGE 720.0 i
'(1)
(1)
(3)
(4)
F = FORCEO.
REASON METHOD EXHIBli G - INSTRUCTIONS
$ -~SCFEDULED A EQUIPMENT FAILURE (EXPLAIN) 1
- MANUAL FOR FREPARATION OF DATA B MAINTENANCE OR TEST 2
- MANUAL SCRAM.
INTRT SHEETS FOR LICENSEE C REFUELING 3
- AU10KATIC SCRAM.
EVENT REPORT (LER)
D
- REGULATORY RESTRICTION 4 OTHER (EXPLAIN)
FILE (NUREG 0161)
E
- OPERATOR TRAINING + LICENSE thAMlWATION F ADMINISTRAi!VE (5)
C
- OPTRAT10NAL ERROR (LXPLAIN)
H
- OINER(EXPLAIN)
EXHIBIT I SAME SOUR;E a
4 5
s 1