Forwards Change 9 to Rev 3 to IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant, Incorporating Changes as Result of 950313 Response to NOV 95002-03 Noted in Insp Rept 50-341/95-02
ML20086L450
Person / Time
Site: Fermi 
Issue date: 07/19/1995
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086L452 List:
References
NUDOCS 9507210202
Download: ML20086L450 (2)


Text

. -..

8 i

V.

-e

_y Douglas R. Gipson '

Senior Vice President Nuclear Ger>eratern Fermi 2 L 6400 North Dme Hghway Newport. Michgan 48166 0 13)586-5249 July 19,1995 NRC-95-0076 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

References:

1)

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 2)

NRC Inspection Report 50-341/95002 dated February 10,1995 3)

Detroit Edison letter to NRC, " Response to Notice of Violation 95002-03," NRC-95-0019, dated March 13,1995-

Subject:

Transmittal of the Detroit Edison Inservice Testing Program (Plan) for Pumps and Valves. Revision 3. Channe 9 Attached is the latest approved copy of the Inservice Testing Program (Plan) for.

)

Pumps and Valves, Revision 3, Change 9.

This revision accomplishes three objectives:

1. It incorporates the program changes required as a result of the Notice of Violation (NOV) 95002-03 (Reference 3).. This NOV concerned the failure to adequately test the core spray pump discharge clieck valves. The change identifies the new testing requirements for these check valves as well as additional check' valves which can only be partial stroke tested in the open direction.
2. The Valve Relief Requests listed in the revised document have been reviewed and revised as discussed in our telephone conference of May 4,1995 with the following results:

l N{

0 9507210202 950719 I

h' PDR ADOCK 05000341 I \\

P PDR

- USNRC July 19,1995_

NRC-95-0076 Page 2 L-(i)

VR-45 and VR-48 are refueling outage deferrals which meet the requirements of Generic Letter 89-04 and do not require prior NRC approval; L

(ii) VR-50 has been deleted; and I

(iii) VR-46, VR-47, VR-49, and VR-51 require NRC approval. VR-46, l.

VR-47, and VR-49 have been revised as discussed in the May 4,1995 telephone conference. VR-51 is the original and requires no funher j

revision.

All of the Valve Relief Requests (VR-45, VR-46, VR-47, VR-48, VR-49, VR-50, and VR-51) have been previously submitted to the NRC.

3.

Other changes have been made as described in the Revision 3, Change 9 -

Summary included with the revised document. These changes are primarily changes resulting from the completion of RF04.

The Inservice Testing Program (Plan) changes will be implemented following revision of appropriate procedures.

The program changes are transmitted for your information and do not constitute a 10 year program update as required by 10 CFR 50.55a.

If you have any questions, please contact Mr. Hari O. Arora at (313) 586-4213.

Sincerely, A.

Attachment i

cc: T. G. Colburn -

11 J. Miller M. P. Phillips A. Vegel ANII - M. Wilson (w/o Attachment)

ChiefInspector, Michigan Dept. of Labor, Bureau of Construction Codes / Boiler Division - R. Aben i