ML20086K953
| ML20086K953 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/21/1983 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8402070088 | |
| Download: ML20086K953 (2) | |
Text
.
TEXAS UTILITIES GENERATING COMPANY L
an mn.o nnu:nmu w.ymman:m.
R. J. GARY
'7 2 % il'." " O T December 21, 1983
,jj,D e
$C " 7 7
'VVb' Mr. John T. Collins Regional Administrator Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Dear Mr. Collins:
The attached letter is in the process of being communicated to all employees involved in the Comanche Peak Steam Electric Station project.
This is a follow up to our discussion concerning the need to have tLis type of policy letter.
Yours very truly, RJG:gb Attachment
/
@*E%**Jg Y n PDR
5 *'
w-t TENAS UTILITIES GENERATING COMPANY 2rO1 BRYAN TOWEH
- DALLAS. TEXAS 78201 MICH ALL D. SPENCE
.....u s, December 20, 1983 T0: All Personnel Assigned to Comanche Peak Steam Electric Station CPSES POLICY REGARDING INTIMIDATION, HARASSMENT OR THREATS All personnel assigned to the Comanche Peak project, whether employed by the Texas Utilities System or con-tractors, are expected to conduct their activities in a professional manner.
Accordingly, acts of intimidation, harassment or threats on the part of construction, Quality Assurance / Quality Control or any other functional organization personnel, will not be tolerated.
Personnel engaging in acts of intimidation, harassment or threats shall be subject to disciplinary action including ternination. The appropriate level of disciplinary action will be determined on an individual case basis.
/
r MDS:ln i
4
-w