AO 74-34:on 740627,rod Block Setpoint of Two APRMs Exceeded Tech Spec Limit.Caused by Instrument Channel Drift. Setpoints Recalibr within Tech Spec Limits
ML20086K479
Person / Time
Site: Peach Bottom 
Issue date: 07/07/1974
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
AO-74-34, NUDOCS 8401270136
Download: ML20086K479 (2)


Text

.

O O

PHILADELPHIA ELECTRIC COMPANY ri

,p- ;: 0 ^, N, 2301 MARKET STREET

/

f fit LI h ) 9 b

PHILADELPHIA. PA.19101 W

Q JULU197.b. I e.

121518414ooo Cs

&)

f a*

C

' ; c '.nt hY. + w[, ; :,'

v

/

Q, !.J)y -,,,,f )

July 7,1974 Mr. A. Giambusso Deputy Director of Reactor Projects United States Atomic Energy Commiss

~1 Directorate of Licensing Washington, DC 20545

Dear Mr. Giambusso:

Subject:

Abnormal Occurrence The following occurrence was reported to Mr. Tom Shedlowsky, A.E.C. Region 1 Regulatory Operations Office on June 28, 1974. Written notification was made to Mr. James P. O'Reilly, Region I Regulatory Operations Office on June 28, 1974. In accordance with Section 6 7 2.A o.~ ti e Teclin i o. i Aner.i f ic a r i nns, u,nna nce i v a ne sweuq*e em: 2 Pc _.-h Bottom Atomic Power Station, the following report is being submitted to the Directorate of Licensing as an Abnormal Occurrence.

Reference:

License Number DPR-44, Amendment Number 1 Technical Specification 3 2.C Report No.:

50-277-74-34 F eport Date:

July 7, 1974 Occurrence Date: June 27, 1974 Facility:

Peach Bottom Atomic Power Station R.D.1, Delta, Pennsylvania 17314 Identification of Occurrence:

Rod block setpoint of two average power range monitors exceeded technical specification limiting setting by less than 0.4%.

Conditions Prior to Occurrence:

The reactor was at 97% power.

Description of Occurrence:

During a routine functional and calibration surveillance test of the JPRM system, two channels were found to hwe their rod block tri setpoints in excess of the technical specification upper limit r

,l O'

(A/'v ' lf () ' ' (,)

)

8401270136 740707

[

j PDR ADOCK 05000277 S

PDR

~,

~O(JrY SERr REGION.

(

Mr. A. Giambusso July 7, 1974 Page 2 Channel A exceeded the limit by 0.4%' power and Channel D exceeded the limit by 0.2% power.

Designation of Apparent Cause of Occurrence:

1 A review of the previous wcek's APRM surveillance tests in-dicated that the trip setpoints were left in the conservative direction by less than 1.0% power. The setpoint failure is, therefore, attributed to slight instrument channel drift.

Analysis of Occurrence:

Due to the minimum deviation from the technical specification limit and the redundancy of the APRM system in its ability to initiate a rod withdrawal block (any one of the six channels can initiate a rod block), this occurrence has minimal safety significance.

a f

Corrective Action

~

The rod block setpoints of the two out of specification i

channels were immediately recalibrated to within the technical speci-4 fication limits. The scram and rod block setpoints of all six APRM channels were innediately checked and found to be satisfactory. The J

calibration procedure has been changed to provide a 1% conservative setpoint to prevent recurrence. These setpoints have been applied to

,{

each channel.

l Failure Data:.

j i

L No previous failures of this type.

]

Very truly yours, I }' s[Lbl.lL i

M.f.Cooney Ass t Gen'1 Sup,erintendent t

l Generation Division l