ML20086K252
| ML20086K252 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/04/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-28551-BSK, DER-83-60, NUDOCS 8401260370 | |
| Download: ML20086K252 (2) | |
Text
._.
7
_y,-
.y g
,g
.L E M NED SG Arizona Public Service Company
'PHOEMX, ARIZONA 85036
,,,, g g P.o. BOX 21666 *
@ jlI !C
,M 5'
1 January 4,1984 M ^'Z 'IT I -
ANPP-28551-BSK/KCP U. S; Nuclear Regulatory Commission Region V i
Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Tire Extension For Report - DER 83-60 l
A 50.55(e) Potentially Reportable Deficiency Relating To Wiring In Unit 2 Main Steam And Feedwater Actuation System By
~
Virro Does Not Meet IEEE-384 Separation Criteria.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and R. Tucker on-September 1,1983 4
(B) ANPP-27911 dated. October 3,1983 (Interim Report)
(C) ANPP-28324 dated, November 30,1983 (Time Extension)
Dear Sir:
-The NRC was notified of a potentially reportable deficiency in i
Reference ~(A), an Interim Report was transmitted by Reference (B),
and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by December 28, 1983.
Due to the-extensive investigation and evaluation required, it is now expected that ' this information will.be finalized by February 22, 1984, at which time a complete report will be submitted.
l There is no new information or change to the Interim Report at this-time.
Very truly y rs,
(-
M mA E.
E.- Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project-Director j~
EEVB/KCP:db cc: See Page Two 8401260370 840104 "
I}
i ppR ADOCK 05000529.
PDRr S
g,)7
~"t..
.9:
\\
+
'Mr. T.-W. Bishop
- DER. 83-60
-Page Two ace:
. Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory _ Commission Washington, D. C. 20555 T. G. Woods, Jr.
G. C. Andognini
'~
_ J. A. Roedel D. B. Fasnacht A. C.. Rogers B. S.' Kaplan W. E. Ide J. Vorees J. R. Bynum l
D. ' D. Green -
P..P. Klute l
A.
C.' Gehr W. J. Stubblefield W. G. Bingham
~
s R. L. Patterson'
- R. W. Welcher R. M. Grant D. R. Hawkinson
- L. E. Vorderbrueggen
- G. A. Fiorelli S. R. Frost J. ' Self l
D. Canady i
' Records Center
[
Institute of Nuclear Power Operations
[
1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339
~
f' i
l l
r, i
s 1
.1 -
E