Text
,
(;
('~j fo' g
m v
TECEIVED Arizona Public Service Company M.T4 P O DOX 21666 e PHOENIX, ARIZON A 85036 9.J/jlI8F!!Gis January 11, 1984 ANPP-28594-ESK/TRB
..u...m y, y U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-68 A 50.55(e) Potentially Reportable Deficiency Relating To PK Battery Racks Were Constructed With Some Nuts and Bolts Which Do Not Meet The Specification Requirements.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Johnson and R. Tucker on September 28, 1983 (B) ANPP-28133, dated October 28, 1983(Interim Report)
(C) ANPP-28471, dated December 19, 1983 (Tiu.e Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested in Reference (C). At that time, it was estimated that a Final Report would be available by January 18, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 6, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours CLil OLLC
~
E. E. Van Brunt, Jr.
APS tice President Nuclear Projects Management ANPP Project Director EEVB/TRB:ru cc: See Page Two 8401260150 840111
/fl PDR ADOCK 05000528 S
_.l b. S]
c- -
o o.
+
Mr. T. W. Bishop' DER 83-68 Page Two ec:
Richard. DeYoung, Director -
Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
J. A. Roedel D. B. Fasnacht A.-C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Florelli
'S. R. Frost J. Self D. Canady Records Center
. Institute of Nuclear Power Operations l
1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l'.
r 1-I 1