Telecopy AO 74-4:on 740825,RCIC/HPCI Flow Test Valve MO-31 Failed to Operate.Caused by Mechancial Difficulty in Valve Motor Contractor.Small Burrs on Contact Pivot Shaft Removed & Contractor Reassembled
ML20086J502
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/26/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J500 List:
References
AO-74-4, NUDOCS 8401240042
Download: ML20086J502 (1)


Text

..

17314 August 26, 1974 g' 'y*

Mr.JcuesP.O'ReilhDirector O

Unite.d States Ato=ic Energy Comission g

Directorate of Regulatory Operations p _.,

'JT.6 631 hrk Avento Q%..?

Kinh of Prussia, Penneylvania 19',06

. Q.~ ]

Subje.,:

Abnorm 1 Occurrence 24-Hour Notification f.:.M. s Confirning W. T. Ullrich's phone conversation with Mr. R. A. Feil,

-[,Q..

f A.E.C. Region 1 Regulatory Operations Office on August 26, 1974.

Reference:

Liccar.t Number DPP.-56 3,g gg h:W w

Technical Specifiention n

g. v.,..

MEY Report No. :

50T- /E-74;4-Report Date:

Au:;ust-26, 1974 Mh/i -9

-iS Occurrence Date: August 25, 1974 Facility:

Peach Botton Ateni Power Station f p.,

R.D. 1, Delta, Pennsylvanin 17314 i <.4 :

. >, = y; xa.

Identification of Occurrence:

J Failura of RCIC/IIPCI Flow Tcat valve to operato Qa}-31) y_

rs i. V

-((. '/

Conditions Prior to Occurrence:

Reactor at approxicately 1% paver. Startup testing in progress.

yh %.

g Nj.

Dercription of Occurrene-:

During startu; testir.; 'f the ECIC syntes, one of the two valves GD-31)

%O3l, in the ficv test line m a the RCIC and HPCI system to the icrus could not tD;c be closed electrical 3 gi) 7f Designation of Apparent Cause of Occurrence:

f;g;

  1. 9 ^

Hechanical dif ficulty in valve cotor contactor.

EI.YN s

Analyrin of occurrence:

jsCp.'..l Both the RCIC and HPCI have an independent valve in the pump flov test piping S,).; y to the tcrus. The valve in the comon return line from both systens is if-Q considered a back-up valve. Failure of this back-up valve to close on either g;fl4 system initiation has minimi cafety significance since the prinary valve would V..

succcasfully stop this flow. This is a normally closed valve which is only M,i:/

open during flov testing of system.

%p;!")~

D: y.y Corrective Action:

The d.c. electrical contactor was disassembled and inspected. A cuall burr 62 Q

%-9;'F van found on the contact pivot shaft. These burra vere renoved and the contactor re-asserbled. The valve was successfully tested and returned to Se.Wf service.

3t.. -

7: M'-

8401240042 740904 Failure Data:

PDR ADOCK 05000278 Eone.

S PDR Very truly yours, 44^ _

W. T. Ullrich, Superintendent jf-

~*

Peach Botton Atomic Power Station ju