17314 August 26, 1974 g' 'y*
Mr.JcuesP.O'ReilhDirector O
Unite.d States Ato=ic Energy Comission g
Directorate of Regulatory Operations p _.,
'JT.6 631 hrk Avento Q%..?
Kinh of Prussia, Penneylvania 19',06
. Q.~ ]
Subje.,:
Abnorm 1 Occurrence 24-Hour Notification f.:.M. s Confirning W. T. Ullrich's phone conversation with Mr. R. A. Feil,
-[,Q..
f A.E.C. Region 1 Regulatory Operations Office on August 26, 1974.
Reference:
Liccar.t Number DPP.-56 3,g gg h:W w
Technical Specifiention n
- g. v.,..
MEY Report No. :
50T- /E-74;4-Report Date:
Au:;ust-26, 1974 Mh/i -9
-iS Occurrence Date: August 25, 1974 Facility:
Peach Botton Ateni Power Station f p.,
R.D. 1, Delta, Pennsylvanin 17314 i <.4 :
. >, = y; xa.
Identification of Occurrence:
J Failura of RCIC/IIPCI Flow Tcat valve to operato Qa}-31) y_
rs i. V
-((. '/
Conditions Prior to Occurrence:
Reactor at approxicately 1% paver. Startup testing in progress.
yh %.
g Nj.
Dercription of Occurrene-:
During startu; testir.; 'f the ECIC syntes, one of the two valves GD-31)
%O3l, in the ficv test line m a the RCIC and HPCI system to the icrus could not tD;c be closed electrical 3 gi) 7f Designation of Apparent Cause of Occurrence:
f;g;
- 9 ^
Hechanical dif ficulty in valve cotor contactor.
EI.YN s
Analyrin of occurrence:
jsCp.'..l Both the RCIC and HPCI have an independent valve in the pump flov test piping S,).; y to the tcrus. The valve in the comon return line from both systens is if-Q considered a back-up valve. Failure of this back-up valve to close on either g;fl4 system initiation has minimi cafety significance since the prinary valve would V..
succcasfully stop this flow. This is a normally closed valve which is only M,i:/
open during flov testing of system.
%p;!")~
D: y.y Corrective Action:
The d.c. electrical contactor was disassembled and inspected. A cuall burr 62 Q
%-9;'F van found on the contact pivot shaft. These burra vere renoved and the contactor re-asserbled. The valve was successfully tested and returned to Se.Wf service.
- 3t.. -
7: M'-
8401240042 740904 Failure Data:
PDR ADOCK 05000278 Eone.
S PDR Very truly yours, 44^ _
W. T. Ullrich, Superintendent jf-
~*