Telecopy AO 74-29:on 741125,HPCI Isolated Following Automatic Initiation.Cause Unknown.Corrective Action to Be Determined
ML20086J188
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/25/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J183 List:
References
AO-74-29, NUDOCS 8401230289
Download: ML20086J188 (1)


Text

-

dl f

h h1LADEl.PHIAELECTRICCOMP b

N Feach Botton Accuic Psw:r Statien g 4,p

/3/9u.NAC./;"l Delta, Pennsylvania 17314 November 25, 1974 Mr. James P. O'Reilly, Director

.]

g*, o g U0itcd States Atomic Energy Colmaission T'

Dirsctorate of Regulatory Operations i t k 'L** N

^631 Pcrk Avenue

)

King of Prussis, Pennsylvania 19406 Subjact:

Abnormal _ Occurrence 24-Hour Notification C= firming W. T. U11 rich's phone conversation with. Hr. Walt Baunack, A.E.C. Region 1 Regulatory Operations Office on November 25, 1974.

l j

Eference: License Number DPR-56 Technien1 Specification Reference 3.5.C R3part No.:

50-278-74-29 Ccport Date:

November 25, 1974 Occurrence Date:

November 25, 1974 Facility:

Peach Bottom Atomic Power Station R.D.1. Delta. Pennsylvania 17314 Identification of Occurrence:

HPCI isolation following automatic initiation.

Conditions Prior to Occurrence:

Unit 3 reactor isolated and scrassmed as part of a startup test program.

DOccription of Occurrence:

During the review of data taken during the 100% reactor isolation test performed on 11/19/74, it was noted that the HPCI had received an initiation signal during the transient.

The HPCI then icnediately isolated. The HPCI was then reset and operated D30ignation of Apparent Cause or;o the reactor and prove operability.

nanually to inject water int Occurrence:

A review of the test data and interviews with the operators present during the transient has not provided an absolute cause.

Analysis of Occurrence:

During this transient, the reactor water level momentarily dropped to the initiation level for EPCI and RCIC.

Reactor water level was immediately recovered by way of the r: actor feedpump.

HPCI operation was not required during this trancient.

All other engineered safeguard systems operated as expected.

This occurrence has minimal safety implications.

Corrcetive Action:

In an attempt to further investigata and determine the exact cause of this occurrence o EPCI quick start with a condensate storage tank to condensate storage tank flow path is scheduled for 11/26/74.

A vessel injection test will be repeated prior to completion of a 100% testing program to further ensure EPCI operability.

Foilure Data:

None.

8401230289 741205 PDR ADOCK 05000278 Vcry truly yours,

~~

fWhWY

^

l l

W. T. Ullrich, Superintendent Pasch Bottom Atomic Power Station i

.