Telecopy AO 74-35:on 741208,deficient Support Found on Limitorque Motor on RHR Outboard Throttable Reactor Injection Valve MO-3-10-154B.Caused by High Vibration During Operation.Damaged Gears Being Replaced
ML20086J158
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/09/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J155 List:
References
AO-74-35, NUDOCS 8401230266
Download: ML20086J158 (1)


Text

". 3 9 7" 'U7 FBIIADntr111A ELECTRIC C0y"'V O

+

);. Q.?.//

( /cuch Bottom Atomic Power S( jion W GL t OD

....., 1 -m

.: ".; w"=~ ~~ ~~- w

- ~ -

.= r.

- -=

Decenber 9,1974

e. Jcuno P. O'Reilly, Director

-a hited States Atomic Energy Commiocion Lirectcrcto of Regulatory Operations (31 Park Avenuo dng cf Pruosia Pennsylvania 19406 l

lsubj cet t Abnorent Occurrence 24-Itour Notification bnfirning W. T. Ullrich'n phone convercation with Mr. Walt Daunack, A.E.C. Region 1 L gulatcry Operations Office on Decenber 8,1974.

r.o f erence:

Licence Nu:aber DPR-56 Technical Specification

Reference:

3.5.A.3 tep;rt No.:

50-278-74-35 4: port Date:

Deccaber 8, 1974

ccurrcnce Date:

December 8, 1974 ceility:

Peach Botton Atomic Power Station, Delta, Pennsylvania 17314 r

rdentification of Occurrence:

D;ficient cupport of limitorque motor on RHR outboard throttable reactor injection valve (MO-3-10-1543).

cnditions Prior to Occurrenco

ImiraLutdom-

'""'.aparati.us-1.n=chutdomooshking. code. -

Ja cription of Occurrenco:

Linitorque cotor cupport on liO-10-154B vibrated loose causinx twtor to fall off limiterque cperater.

caignation of Apparent Cause of Occurrence:

111gh vibration during operatim of this valve couned cap acrews which hold the cotor to cu cdapter plato to loopen.

tanlycic of Occurrenco:

Thio occurrenec' causco the valve to fail in the "ac-lo" position.

During shutdown coolt-operctions, the valve can be positioned nanually to provide proper nhutdown cooling flow rato.

During reactor operation this valve io normally in the full open pooitton.

High vibrction la only prosent when valve is operating in a throttling trodo.

Safety cignificance is ninien1 sinco the high vibration which cauood failure to not preocnt with the reactor in operation.

-Crrcctive Action:

Dausged nears cro being replaced.

The adapter plato 10 being repaired.

New bearingo fo' th2 cotor vill be provided.

The cator vill be refantened to the cdapter plato using nw ccp cerevs and LOC-TITE.

The reactor can be returned to norvice with the 154D valve in th3 full open position cince the valvo corvos no saf ety function.

iciluro Data Siciler fcilurco hevo occurred as reported in Abnormal Occurrence Report Numbern 50-277-74-53 and 50-270-74-28.

pQ{)_

firy truly yours.

?Q /h Y d

A T. Ullrich. Suporintendent g

teach Botton Aconic Powar Station i

8401230266 741218 PDR ADOCK 05000278 1 r) f p#n S

PDR L43 COPY SENT REGION '

i