Telecopy AO 75-43:on 750613,limit Switch LS-4223 Failed to Operate SV-4223 on Low Accumulator Level.Cause Under Investigation.Accumulator Manually Vented to Ensure Head Spray Line Maintained Filled
ML20086H778
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/16/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H775 List:
References
AO-75-43, NUDOCS 8401200237
Download: ML20086H778 (1)


Text

e (v'N Q-m

~

V PIIILADELPHIA El.ECra:C COXPANY Peach Ectton Atonic Power Station Delta, Pennsylvania 17314 June 16,1975

s..

s br.:.Jntees..P. O'Reilly, Director:

.r_

Ice of, Inspection, and Enforcenwnto.-

9 g j,g United Staten Nuc1 car Regulatory Cot = mission,

' 631 Park ' Avenue - ---*

King of. Prussia,Pennsylvanie.19406

.,Sub_iectr$ ; Abcorr.alj Occurrenen 24-Hour Notificat$otr ;.

~...

, /_Confiruinr;.y,,TLU11 rich % phone. conver.p'tiona to Mr.. Don Caphton, Region, L United Sectes Nuclear. Regulatory. Connianion, on June.13,1975 Reference.p. < License. Number DPR-.44... -

H ttfGr3fE7a Syec2?rerE ctry. Stem,.w.- -.",.MC Eeport Ha.:.*

50-277-75-43 Report Date:

June 13, 1975 O ccurrence. Date r.. June 13,1975.

Facility:

-"- Peach Bortou Atomic. Power Section-R.D.~1 Delta, Penns,1vania, 173J/f Identification of Occurrencet Failure of LSd.22I t6 ' operate SV-4223' (R.IIR Eead Spray'1[na hYah'Eoint. vent) on lov eccumulator. level.-

Conditions Prior tn occurrences a Udit 2 chutdown.

~

' ' ~ ~

- ~..

. Descriptien of Occurrence.

'Upon. receipt of the hvad' aprayeacctentator low level eloca, inventin stion revealed that the-vent solenoid valve failed to open-to refili the head sprey hibh point

. as.cu=ulator..

Designation of Apparcut. Cause. of Occurrencet Under invcatigation.. *

~

AnalyeJs of'Occurrencer There are no anfety-implicati'ons because.the: level evitch alarmd.proparly and the-operator was able to cann:sily perfom thr ftmetion. of. the vent. t olenoid valve-+

bo'rrectivo. Actions.

Tho' operator r: anus 11y. vented the. accuraulator to.-ensure that the-bend opray 'line wat paintnined. filled.c. This is being. done once per shif t t..til the. problen *is corrected.

Faflure: Datar.

i Siniinr tfeiturca reported as AO-50-277-75-4, 50-278-75'-20,. and' 50-272 75-34.

7

  • Very trttiy: youro. -

~

)W[W&.

N V..T.

Ullrich.. Seperar::endent.:.

. s~sPeach Bat tomAtoL;dc Power Etation.

-A...

t,

}'

i.

.. - ~

8401200237 750620 lDRADOCM 05000277 PDR

. -