| Site: | Peach Bottom |
| Issue date: | 06/20/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086H736 | List: |
| References | |
| AO-75-47, NUDOCS 8401200173 | |
| Download: ML20086H737 (1) | |
Text
_
.j O
e ELPHIA EI.ECTRIC COMPANY!
Fesch Botton Atomic Power Station Delta, Pennsylvania 17314 June 20. 1975 Mr. Jeaes P. O'Railly, Director Office of Inspection. and Enforcement; c Regton:1
$/,/>'
United States Nuclear. Regulatory.Commissian,
~ ~
~,*t/f/zd8C 631 Park Avenue
//
King of Prussia, Pennsylvania 19406 -
d#
/
RFWf
-,'t.,4
Subject:
Abnornal Oce:rrence 74-Hour Notification 7
.A a-
' Confirming W. T. Ullrich'n. phone conversation with Mr.. Walt Baunack, Region.1..
-.h ',
United States NuclearcRegulatory Cosatission on June 20._1975.
- 3; h* :
.-9 A
. ;[. (,',M i '-
Reference:
License Number DPR-44 Techniesi > Specification Refarence.t 3.7.D F'%
.5 f ',
B Report No.:
50-277-75-47
~~
~ '
"E
~
Report Date:
June 20.1975-Occurrence Date: June 20. 1975 Facility:
Peach Botton Atomic Power Station E.D. 1. Delta. Pennsylvania 17314 Identification of Occurrence:
Emactor Water Cleanup Inlet. Outboard Isolatic.n Valve-70-2-12 inoperable electrical 1}
Conditions Prior to Occurrence:
--- - Unit 2 reactor shnJe.
Description of cccurrence Reactor Vater C1manup System MO-2-12-18 failed to operate electrically from snain ecatrol room avitch. The valve was in the open position end the Reactor Water Cleanup System was in operation prior to the occurrence.
Designation of Apparent. Cause of Occurrence: -
The control fuse in the motor circuit breaker blev several times when valve motion -
was attempted. The valve was lef t in the open position and circuit breaker lef t open.
Analysis of Occurrence:
Since the other isolation valve in this line is operable, the safety implications are minimal. Both Reactor Water Cleanup inlet isolation valves did isolate on a PCIS Group 2 isolation which occurred on reactor scram several hours earlier.
Corrective Action:
~
Investigation of the cause of the control fuse blowing is in progress.
Failure Data None previoas.
Very truly yours.
fWWM W. T. Ullrich. Superintendent Fesch Botton Atomic Power Station s