ML20086H709

From kanterella
Jump to navigation Jump to search
Telecopy AO 75-50:on 750621,unplanned Release of Contaminated Water to Discharge Canal Occurred.Caused by Tube Leak in RHR HX D.Hx Undergoing Tube Repair
ML20086H709
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/23/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H708 List:
References
AO-75-50, NUDOCS 8401200129
Download: ML20086H709 (1)


Text

_ _ _ _ _ _ _.

O O

FBILADELPHIA ELECTRIC COMPANY !

Peach Lotion Atomic Power Station D<alta, Pennsylvania 17314 June 23, 1975 M b I - P. O'Reilly. Director;

....p Office of Inspection and Enforcement >.

M.2f.Jg..

. Region 1 Un'.ted States Nuclear Reguimtory Comatission-631 Park Avenue

.s King.cf Prussia. Fenvylvacia. 19406,

Su'irett Abnorm 1. Occurrence 24-Hour Notiff cation I

b

..Confirmin,t W T. U11 rich's phone conversation-with Mr. Jiza Partlow, Region 1,

' United States Nuclear. Regulatory Ctnaission on June 22. 1975.

Referencer License Number DPR-44

.- 7

'~' Technical Specification:2eferences' 3. 8 A',--

Repore No.:

50-277-75-50 Report Datet-June 22.1975

.Occu~rr'ence Datet June 21, 1975 Facility:

Peach Botton Atomic Power Station R.D. 1. Delta, Pennsylvania 17314

--Identification of c a m.e ca.

, Unplanned release of cont *Linated watergte the discharge canal.:

Conditions Prior to Occurrences.

Unit 2 shutdown..

Description of Occurrencet During investigation.of a suspected tube leak in the.. "D" RHR heat exchanger thage was apparently some v.igration of reactor water into the High Pressure Service Water ;

System side of the heat exchanger. As soon as a Icak was positively identified -

the heat exchanger was removed from service and isolated.

Designation of Apparent. Cause-of Occurrence:

Tube leak in

'D' RER beat exchanger.

Analysis of occurrence:

There was mininal safety significance associated with this tube failure. Initial water analysis indicates.a low value of microcuries released.

Corrective Action:

Beat evenanger undergoing tube xepair.

Failure Date:

None previous - liquid release.

Very truly yours, fNNIY U. T. Ullrich, Superintendent-Feach Bottom Atomic Power Station S

e 8401200129 7S0701 gDRADOCK 05000277 PDR l

.