ML20086H686
| ML20086H686 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/24/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086H685 | List: |
| References | |
| AO-75-45, NUDOCS 8401190558 | |
| Download: ML20086H686 (1) | |
Text
.
(
PHILADELPHIA EL E CT!< I C: CO!!PAHY Peach Botton Atonic Power Station Deltn, Pennnylvanin :/
17314 a3ynpy197:5 V- -
r- :, -.., _.
- f. u fAL..
P~
r.
Jauco P.
O'.Rei1ly, Director v
- Office. of Innpcetio:t and En f or c ement,-
' Region 1-M Ay M.M2
-Unit & fit at en, Hu c 1 ear..Regulut.ory. C.ommi nnion;
'631 Park Avenue.
King of Prussia, P,enn cylvan-i n. 19406
Subject:
Abnornnl Occurr_ence-Ph-1?our Noti f 5 e n ti on-Conf.irming.R..S. F'leinchmann's phone conversation.vith M r... J.- Partic.
,..R e g i o nyl., UnitrC Staten Huc1cnr-Qegylatory Connianion.on. July 2h, 15M I
H e f e r e n c e':-. Licence. Number DPR-56 m.ri-ec l-S peeMientr i on" Re fe ronc e :
h. b A. *> +'
t
-Report No.. :
'50-270-75-h5 July 2h, 1975 Report Date:
Occurrtence Date: July 23. 1975,
Fccility:
Pench Botton Atomic Pover. Station..
R. D.. i 1, Delta, Pennsylvania, 1731h-I d'e n t i fi c at.i o n of Occurrence:
Lenk.in.prinnry containment testableh penetrr. tion.
Conditions.. Prior to Occurrence:
Unit 3 at approxi=ately 507, power.
Description of Occurrence:.
Durinr, local leak rate tent, a lenk van found in the inner b ellovs'. o.f. n doubic bellows conte.inment penetration.
Designat-i'ontof Apparent Cnuno.of Occurrenoc:
Unknown.
e Analysis.of Occurrence:
Hensure=ent of the test space pressure i n d i c t. t.e s. t h a t. it is the sanc as dryvell. pre s s ure.
Therefore, only the inner bellovs ic lenking,nnd pri=nry containment. integrity hac been naintained. The e
screty signifiennce-is minimal.
Corrective Action:
It in anticipnted that the bellovn vill be inspected and repnfred during the next outage.
Previouc Data:
None previoun.
Very truly yourn, G4/
W.
T.
Ullrich, Superintendent I
Peach Dotton. Atomic Power Station
- 6 ems.
m-
-e...
,m
.. ass.m" PDR u