ML20086H677
| ML20086H677 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/25/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086H676 | List: |
| References | |
| AO-75-46, NUDOCS 8401190550 | |
| Download: ML20086H677 (1) | |
Text
.
4 o*..
a PHILADULPHIA ELECTRIC COMPANY /
Peach Dotton Atomic Pover Gtation Og/fy/pp' U cit a,. Petanoylvania 17314
[d July 25. 1975
[4/4 ((
fat c/A etcf*
Mr. Jaues P.
O'Reilly, Director Office of Inspection. and Enforcement Region 1 United States Duclene Regulatory Commission 631 Park Avenue King o f Trustni.rs _P.en n ny1 + = t s -
lo'unn S ub,1 e e t :
- Abnorryd oneurrenw-7tretTou r ThWfic at"io_,
.[.
,y Confirming R..S. Pleiochuann!s. phone conversation with Mr. Caphton Region 1
... _.3 United States I;uclear Regulatory Conninaion on. July _25, _
. -.. - - -.=
Reference:
License Nunber DPR-56 Technical Speciffention
Reference:
3.11.D Beport
'~r:
5.O-276.-765 E5 -
D r=p *w *_D r t rey
.T u i i+
'5 M _
1_O 'ly
. Occurrence Date:
July 25. 1975
-Facility:
Peach Botton Atenic Power Station LUr R.D.
1.- Delta. Pennsylvania - 17 31k '
Identifienfion,of Ocpurrence :
Inoperable hydre.ulic enubber on RHR pump discharge line.
Conditiono Prior to Occurrence:
Unit 3 operntsng at approximately s0%< power.
Doncription of Occurrence:
A' routine innpection of Unit 3 nubbern outside the drywell identified snutber 3-IO-HL-S-12 as failed.
Designation of Apparent Cauce of Occurrence:
Failure of a st reet. cibow andt, loos.c? iaa. of reservoir retaining bolts f rom.vt:'uration caused the reservoir to fall cift.it s.
a i
mount.,
Analysis of Occurrence (Safety Implications)
No damage to piping or supports was noted during the ~~
inspection.- Safety implicationn~are, therefore, ninimal.
Corrective Action:
The onubber ir being repaired.
The ur.d)$$ tion procedure Hill s
being revised to call attention to the renervoir retnining bolta'and the elbow on the reservoir.
Snubber surveys are
.(3 continuing on a routine basic.
Unit: 2 snubber curvey van conpleted catifactorly in June, 1975.- No other snubbers were found inoperabic in Unit 3..
Failure Data:
AO-50-277-7k k5.
50-277-7k-34 50-278-7L-16 50-278-7k 8
Very'truly yours.
Wbm/
~
m W,T.
Ullrich, Superintendent i
Peach Dottom Atcuic. Power Station WTU/nfo
=
e 8401190550 750804 t
PDR ADOCK 05000278 g
[
-n,
,