k PHILADELPHIA ELECTRIC COMPANY V Peach Botton Atomic Po,vereStation Delta Pennsylvania AI31 July 31, 1975
. Q gM' %
Mr. James P.
O'.Reilly, Director T./ A Office of 7.nspection and Enforcement hM @p Region 1 United > States Nuclesr Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19h06
Subject:
Abnornal Occurrence 2k-Mour Notification _
Confirming R.
S. Fleischmann's phone conversation with Mr. Walt Baunack, Region 1, United States.3uclear Regulatory Commission on July 31, 1975
Reference:
License Number DPR-56 Technical Specification
Reference:
3.7.3 and 4.7.D Report No.:
50-2TS-75-kT Report.Date:
July 31, 1975 Occurrence Date:
July 31, 19T5 Facility:
Peach Bottom Atomic Power Station R.D.
1 Delta. Pennsylvania L7314 Identification of Occurrence:
[
. Failure of Pri=ary Containment Isolation-Valve.AO-3969A to.close.
Conditions-Prio'r to Occurrence:
Plant operating at 55% Power.
Description of Occurrence:
During the performance of the PCIS normally oper valves surveillance
-test. the instrument N header _to dryvell AO '3969A failed.to close 2
when actuated from the remote control switch.x Air.was manually' vented
^
and' the valve closed.
It was then.~ operated satisfactorily six times
- from the remote control switch.
Designation of Apparent Cause of Occurrence:
Under. investigation.
Analysis of Occurrence:
There are two check valves in series.downstreas of AO-3969A in the instrument'3 header to the dryvell.
These check valves would prevent 2
l 1eakage from the drywell to the reactor building, therefore, the failure has minimal safety implication. A Corrective Action:
The solenoid valve will be disassembled, inspected, maintained, and retested.
Failure Data:
AO-50-278-75 k. AO-50-278-7k-7, AO-50-278-7k-26 and AO-50-278-Tk-39 Very fruly yours, N A :
=', Superintendent W.
T.
Ullrich Peach Botton Atomic Power Station 8401190540 750731 PDR ADOCK 05000278 S