Text
9 s
3
)
j l
PHILADELPHIA ELECTRIC CCMPA5Y Peach Botten Atc=ic Power Station Delta. Pennsylvania v'
17314 August 8, 1975
)' ~, s oj' h Kr. Ja:es P. 0*Reilly, Director Office or Inspection and Enforcecent
]gg dhdu:R Region 1 United States Suelear Regulatory Coc=ission 631 Park. Avenue King of Prussia, Pennsylvania 19aC6 S ub.i e ct :
Ab no rr.n l Oecurrence 2t-Hour notifiestien Confir=ing 3.
C.
Scith's conversation with Mr.
k* alt Baunact, Region i United States Nuclear Regulatory Conmicsion on August 7, 1975
Reference:
License Nu=ter OPR-56 Tectntesi 0, w s ' ri cati e-Ocfc.;ner:
3.7 5_1 g---
' R eport 7o.T S cr-278-75-L 9 Report Date:
AGEust 7, 1975 Occurrence Date:
August 6, 1975 Facility :.
Peach Botton Atomic Power Station R.D.
- 1. Delta, Pennsylvania 1731L Identification of Occurrence:
Leakage from feedvater check valve 6-96A (outboard)..
Conditions Prior to Occurrence:.
Unit critical, starting.up.
Description.of Occurrence:
Water was found to be leaking from the bonnet joint on the outboard feedvater check valve 6-96A.
Designation of Apparent Cause of Occurrence:
Under investigation Analysis of Occurrence:
The safety inplication of this occurrence is minimal,sinie under normal, conditions, the leak. is feedwater, and depressurization and' shutdown was. initiated when the leak was discovered.
l Corrective Action:
l The failure is being repaired and will be tested.
t Failure Data:
A previous failure was repdrted as A0-277-75 L3 i
l Very truly'yours, 9 N kWJ" W.
T.
Ullrich. Superintendent Peach Botton Ato:ic Power Station l
8401190512 750808 PDR ADOCK 05000278 S
' ^
~ hwn
===_.
t l
,-..n r