ML20086H275

From kanterella
Jump to navigation Jump to search
AO 50-271/72-08:on 731020,during Automatic Depressurization Sys B Logic Test,Relief Valve Initiation Time Delay Relay 2E-K5B Energized at 123 S,Exceeding Tech Spec Limit of 120 S.Relay Immediately Reset
ML20086H275
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/20/1972
From: Riley B
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H274 List:
References
AO-50-271-72-08, AO-50-271-72-8, VYV-2296, NUDOCS 8401160245
Download: ML20086H275 (1)


Text

p-O O

/VN 1

(

VICRMONT YANKEE NUCLEAR POWER CORPORATION I

nevcNrv ocvcN ottovt GTRCET Rurt.AND, Wo40NT 03 manyvo.

P. O. DOX 157 venNON VERMONr 05354 October 20, 1972 United Stateo Ato nic. Encry.y Coutsission Directorate of Regulatory Operations, Region I 970 Broad Street Newark, New Jersey 07102

REFERENCE:

Operating Licenne DPR-28 Docket lio. 50-271 Abnornal Occurrence No. A0-72-08 Gentlenent An defined by Technical Specifications. for the Vernont Yanhec Nuclear Power Station, Section 6.7. A.c, we are trporting the following Abnornal Occurrence an A(972-08 and confirning our telephone conversation with your office on this date.

At approxinately 10:00 a.m. on October 20. during conduct of the Auto::atic Depressurization Systen

'B' Logic Test the Relief Valve Initiation Tine Delay Relay (No. 2E-K5B) was found to energize at 123 eeconds. This constitutes a violation of the specified t.itur in Table 3.2.1 of Technical Specifications, which requirca a tino delay of < 120 acconds.

The reactor voo operating at approxinately 50% pover at the tirae of thio occurrence.

The relay was it=nediately recet, functionally tested and verified to be opersbic at a titte delay of 117 seconds. This remedial action van co:pplcted in a tino apan that precluded the neccooity of further irmediate.

action.

Very truly youro, l

VEPJ'ONT YANKEE NUCLEAR POWER CORPORATION D'

0401160245 721026 r

/

{DRADOCK05000 y

Bradford W. Riley Assistant Plant Superintcodent MFL/rpb s,[/ f

^j U

W

,t l I h