AO 50-271/72-09:on 721026,two Barton Steam Line Differential Pressure Switches (DPIS 13-83 & 13-84) Actuated at 195 Inches,Exceeding Tech Spec Limit of 180 Inches.Switches Immediately Reset
ML20086H250
Person / Time
Site: Vermont Yankee, 05000000
Issue date: 10/27/1972
From: Riley B
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H243 List:
References
AO-50-271-72-09, AO-50-271-72-9, VYV-2304, NUDOCS 8401160146
Download: ML20086H250 (1)


Text

. u- ~-w__,.__ w .. .u_ _ ._ _

b O Y VERMONT YANKEE NUOLEAR POWER CORPORATION szvCNTY OcVCN OROVE STMcCT RurLAan. VenMONT 05701 many voi VYV-2304 P.o. sox is7 VERNON. VERMONT 05s54 October 27, 1972 United States Atomic Energy Comission Directorate of Regulatory Operations, Region 1 970 Broad Street Newark, New Jersey 07102

REFERENCE:

Operating License DPR-28 Docket No. 50-271 Abnormal Occurrence No. A0-72-09 Gentlenent Aa defined by Technical Specifications for the Vermont Yankee Nuclear Power Station, Section 6.7.A.c, we are reporting the following Abnormal Occurrence ao AO-72-09 and confirming our telephone conversation with your office on this date.

At approximately 3:00 p.tn. on October 26, during conduct of RCIC Surveillance Testing, two Barton steam line differential pressure switches (DPIS 13-83 and ~84) were found to actuate at >195" R20. This constitutes a violation of the pressure set point specified in Table 3.2.2.3 of Technical Specifications, which requires actuation at a pressure of 180 + 15" H20. The reactor was at approximately 60% power at the time of this occurrence.

The switches were imediately reset, functionally tested and verified to be operable within the tolerance specified. This remedial action was completed in a time span that precluded the necessity of further imediate action. .,,a w vi 0U2^ ,

20 ;,.1 A DE u - '

1 g; 7; ;y }g,j'J VERMONT YANKEE NUCLEAR POWER CORPORATION N

S O gg; , . s Bradford W. Ri1 @ D 7)

,a Aasistant Plant Superintendent NFL/rpb

o 4 -

UNITED STATES ATOMIC ENERGY COMMISSION 8}.;

DIVislON OF COMPLI ANCE 201 645 l* l REGION I 970 BROAD STREET N E W A lt K. NEW JERSEY 07102 i