I VERMONT YANKEE NUCLEAR POWER CORPORATION scvr>4TY scvtre OROVC STnecT RuTLAnn, Vunnonr osvon VYV-2313 P. O. BOX 157 VERNoN. VERMONT 03154 November 2, 1972 Directorate of Regulatory Operations Region I United States Atomic Energy Co=:11ssion.
970 Broad Street Newark, Nrr., Jersey 07102 REFEREllCE t Operating Licenno DPR-28 Docket No. 50-271 Abnorreal Occurrence No. A0-72-10 Gentlenent An defined by Tnchnical Specifications for the Vernont Yankee Nuclear Power Station, Section 6.7.A.c, wo are reporting the following Abuunnal. Occurrence no AQ-72-10 and confirming our telephone convarention with your office on thio date.
In the afternoon of Novenbar 1. during conduct of Reactor Protection Synton Surveillance Testing, a Serna Diucharge Volune High Water Level Switch (LSit 3-231C) failed to actuate on high water inval. *1111n conctitutes a l
violation of the icvol not point specified in Table 3.1.1 of Technical Spootfications, which requiren actuation at a oct point of g 24 gallons.
The reactor was at approxinately 54% power at the tino of thin occurrence.
The ouitch float chamber was irmediately cleaned and flushed and the rnritch van functionally tested and verified to be operabic within the tolerance apacified. This remedial action van compinted within one half hour and precluded the necessity to insert control rodo as required by Note 3.a to Table 3.1.1.
Very truly yours, VERH0NP YANKEE NUCLEAR POWER CORPORATION 0401160083 721110 DR ADOCK 05000 r) w B W. Riley 'N Anniotant Plant Superintendent MFL/rpb e