Telecopy AO 75-57:on 750902,RCIC Inboard Isolation Valve MO-3-13-15 Failed to Open.Cause Under Investigation.Addl Surveillance Required by Inoperable RCIC Initiated
ML20086H142
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/03/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-75-57, NUDOCS 8401130450
Download: ML20086H142 (1)


Text

.. _ _ _ _ _ _ _. - _.

L. J r

t (9

(

\\

j

./

j

/

~

1 THILADILFM!A ELECTRIO COMPANY e

?each 2 otto: Ato=i: ?:ver ftation

)

Delta, Pendsylvanis 17314 S er *. *

.- ?, 19 7 5 Mr. Ja=es ". ?,'Reilly, Director u

Office of Inapection and Enforcement 8-p Recion,1 atf./g, United States nuclear Regulatory Co==ission 631 Part Avenue King of Prussia, Pennsylvania 19406

Subject:

Abnor=al Oecurrence PL-Hour Not ifiention Confir=ing R.

S.

Fleischnenn's phone conversation with Mr. Welter Baunaci Region 1 United States nuclear Regulatory Co= mission on September 3, 197"

Reference:

License Nu=ber DPR-56 Technical Specification

Reference:

3.5 Report No.:

50-278-73-57 a

Report Date:

September 3, 1975 i occurrence Date:

September 2, 1975 Facility:

Peach Botto= Atomic Power Station j

R.D.

1. Delta, Pennsylvania 17314 s!

Identification of Occurrence:

~

Failure of the RCIC inboard isolation valve Mo-3113-15 to open.

f Conditions Prior to Occurrence:

Unit 3 at approximately 555 power.

Description of Occurrence:

During the performance of a curveillance test. MO-3-1Y-1.5 was intentionn elosed by an isolation scram.

Following the reset of the isolation.

the valve could not be reopened.

Designation of Apparent Cause of Occurrence.

Under investigstion.

0 Analysis of Occurrence:

Safety i=plications are minimal because RCIC is backed up by the HPCI r

l syntes, and becau:c the systen was returned to service t h e s ame d ay.

Corrective Action:

The additional surveillance required by a inoperable RCIC system was initiated.

Following a plant scras not associated witn this abnormal l

l, occurrence, the RCIC valve was reopened.

Failure Data:

l None previous.

i Very truly yours.

V.

T.

Ullrich. Superintendent Peach Botton Ato=ic Power Station t