ML20086H134

From kanterella
Jump to navigation Jump to search
Telecopy AO 75-59:on 750905,instrument Nitrogen Compressor Suction Valve AO-5235 Failed to Close.Caused by Actuating Solenoid Valve for AO-5235 Failing to Drop to Deenergized Position.Actuating Solenoid Valve Replaced
ML20086H134
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/05/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-75-59, NUDOCS 8401130442
Download: ML20086H134 (1)


Text

+

_______-- m I

=

1

.w.

  • O

.Q

~-

4 1

~

./

i 4

PHILADELPHIA II.ECTRIC. COMPANT Peach Ectron Atosic Power Station i

i Delta, Pen 4sylvania 1731%

Mr. James. P.. O'Reilly, Director September 5,1975 Office of Inspection and Enforcecent Region 1 United States Nuclear Regulatory Cor:sission P

/

hgd.8 DdluMM 631 Park Avenue King of Prussia, Pennsylvania 19406

.$ub_t eet t Abnereal Occurrence 24-Hour Notification Confirming R. S.

<sulatory Commisolon on Septer.ber 5,1975.Pleischr. ann's States Nuclear

Reference:

License.Nucher DPR-56 Technic =1 spectferneinn r,*

renre 1_7_n_t Jteport No. :.

50-278-75-59 Report Date September 5,1975 Occurrence Date:

Septec.ber 5, 1975 Facilityt Peach Bottom A' to=le Pover-Station R.D. 1. Delta, Pennsylvania. 17314 Identification of Occurrence i

A instrur4nt Nitrogen Co= pressor Suction valve, AD-5235, failed to close Conditions Prior to occurrence:

Norsaal power operation at approxicately 50?. power.

Dascription of Occurrence:

i During testing, A0-5235 failed to close when given a close signal Designation of Apparenc Cause of Occurrence The core in the actuating solenoid valve for AO-5235 failed to 4 top to the de-e position.

Subsequent cycling of the valve caused it Following a previous f silure, inspection of the valve did notto operate correctly, repeatedly.

failure.

The valve was successfully operated 30 ti:aes following the inspectic.n.

revaal any rensen for 4

Analysis of Occurrence:

Safety i=plicatiuns are minimal because the valve subsequently operated correc several times.

Corrective Action:

Replace the actuating solenoid valve.

Failure Data:

Report No. 50-278-75-54 dated September 3,1975.

?

s Yety truly yours,

~

U. T. Ullrich, Superintendent Peach Botton Ator.ic Power Station I

8401130442 750905 PDR ADOCK 05000278 S

PDR

,4 pon ssNr REGION s

}

2