ML20086H132
| ML20086H132 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/22/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| AO-75-60, NUDOCS 8401130439 | |
| Download: ML20086H132 (1) | |
Text
^
~
~
w w
'j O-O 3
PHILADELPHIA ELECTRIC COMPANY Peach Sottom Atomic Power Station Delta. Pennsylvania 1731k September 22 1975 i
Mr. James P. O'Reilly, Director e_ da,, 22 e Office of Inspection and Inforcement 2s 4
d States Nuclear Regulatory Corr. mission 631 Park Avenue
. King of' Prussia. Pennsylvania 19406
Subject:
Abnormal occurrence 2L-Hour Notification Confirming W.
T. U11 rich's phone conversation with Mr. Walt Bauasck.
Region 1, United States Nuclear Commission on September 19. 1975 References License Number DPR-56 Technical Specification
Reference:
3.T.D Report No.:
50-278-75-60 Report Date:
September 19. 1975 Occurrence Date September 19. 1975 Facility:
Peach Botton Atomic Power Station R.D.
1, Delta, Pennsylvania 1731k
~
Identification of Occurrence:
fully close.
Toru,a water cleanup pump suction valve Mo-3-ik-To failed to i
Conditions Prior to occurrence:
Unit 3 shutdown.
Description of Occurrence During routine operations 'AO-3-1k-TO failed.t. close.
Designation of Apparent Cause of Occurrence:
Under investigation.
Analysis of Occurrence:
Safety implications are minimal because the outboard isolation valve l
WO-3-14-71 was closed.
Further. MO-3-1k-70 vill remain closed until corrective action is effected.
3
~
Corrective Actions r
t-Investigation in progress.
t l
Failure Dates:
Abnormal Occurrence Report No. 50-278/75 k3.
Yery truly your',
s i
e r#
W. T. Ullrich Superintendent l
Peach Botton Atomic Power Station i
i Jws
(
8401130439 750922 PDR ADDCK 0500027]
l s
k 4
,