Text
i.
W Q:
O..
PHILADELPHIA ELECTRIC COMPANY Peach Botton Atomic Power Station Delta, Pennsylvania 1T314
,_ __.... r;-_.
Mr.' James P.
O'Reilly," Director September 22, 1975
~
~
A Office of Inspection & Enforcement
,#2;e 4 Region 1
' United States Euclear Regulatory Commission
~~
g 631 Park Avenue g4 King of, Prussia Pennsylvania 19h06
Subject:
Abnor=n1 Occurrence 2L-Nour Notification Confirming R. S. Fleischmann's phone conversation with Mr. Walt Bau=ack,
' Region 1. United' States Euclear Regulatory Commission on S-ptember 22 1975 Re fe'rence :
License Number DPR-56 Technical Specification
Reference:
4.6.D.3
- Report No.:
50-278-75-63 Report Date:
September 22 1975 Occurrence Date:
September 21, 1975' Facility:
l Peach Botton Atomic Power Station R.
- 1. Delta, Pennsylvania 1731k t
Identification of Occurrence:
PS-3-2-71E sud PS-3-2-71L inoperable (Relief Valve Bellows Pressure ewarsas.
Conditiens Prior to Occurrence:
Unit 3 cold shutdown condition.
Description of Occurrence:
During, surveillance testing of the relief valve bellows pressure l
- switches ' the E and L switches were found to be inoperable.
Designation of Apparent Cause of Occurrence:
Failure of an electrical connector.
Analysis of Occurrence:
Because the reactor was in the cold shutdown condition and the rensining pressure switches were verified to be operable, this occurrence has mini =al safety implications.
Corrective Action:
The electrical connectors were repaired, retested,and returned to service.
Failure Data:
None.
Very truly yours, f f e-*-cA
)
W. T. Ullrich, Superintendent Peach Bottom Atomic Power Station I