_ __
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHIA PA.19101
'o.
(21518414000 tI
./g
~~
.,.\\
,a March h,1975 Mr. A. Gianbusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulations United States Nuclear Regulatory Cct=tission Washington, D.C.
20555
Dear Mr. Gimbusso:
Subject:
Abnomal Occurrence The following occurrence was reoorted to Mr. Tcet Shedlowsk,
/
Office of Inspection and Enforcement, Regien 1, United States Nuclear Regulator / Comnission on Febraary 22,1975 Written notification uns r.ade to Mr. Jees P. O'Reilly. Office of Tntipm+.4 nn.and W ra-a-t, Region ], United States Nuclear Regulatory Ccaniscion on February 2h, 1975 In accordance with Section 6.7.2.A of the Technical Spccifications, Appendix A of DFR-56 for Unit 3 Peach Botton Atomic Pctier Station, the following report is being submitted to the Directorate of Reactor Licensing es an Abnomal Occurrence:
Reference:
License Nunber DPR-56 Tcchnical Specification
Reference:
h.11.D.1 Repcrt No.:
50-278-75-15 Report Date:
March h,1975 Occurrence Date:
February 22, 1975 Facility:
Peach Botton Atcnic Power Station R.D.1, Delta, Pennsylvania 1731h Identification of Occurrence:
Incperable hydraulic snubber on HPCI Stean line.
Conditions Prior to Occurrence:
Reactor shutdcun; naintenance outage in progress.
i 2554 8401130162 750304 gDRADOCK05000
Y, e Mr. A. GitnbussoA O
r ce 2 March h, 1975 V
Descrintien of Occurrence:
A routine inspection of Unit 3 dr;/well hydraulic snubbers during an cutage identified snubbers 3-23 DM 5-23 as having an cr:pty i
reservoir.
Desirmation of Apparent Cause of Occurrence:
The cause of the enpty snubber reservoir is under investigation.
Analysis of Occurrence:
No danage of piping or supports was noted during the inspection.
Safety inplications are, therefore, minimal.
Corrective Action:
The source of Icakage from the snubber could not be identified.
j The snubber reservoir was refilled. This snubber shall again be inspected the next time access to the drywell is available.
i Failure Data:
Additienc1 hydrculic snubber difficulties were reported as j
A0-5-277-7h-h5, 50-278-7h-3h, A0-50-278-7h-16, A0-50-278-7h-8.
Very truly yours, h /h M. '. Cooncy 1
As 't Gen'l Superintendent
- Generation Division cc:
Mr. J. P. O'Reilly Director Office of Inspection and Enforcer.cnt I
Region 1 United States Nuclear Regulatory Connission 631 Park Avenue King of Prussin, PA 19h06 a.
-