ML20086G864

From kanterella
Jump to navigation Jump to search
Telecopy AO 75-37:on 750701,main Steam Line Radiation Monitor RIS 3-17-251C Failed Downscale.Caused by Failure of Test Relay to Pick Up Following Test.Failed Test Relay Replaced & Drawer Receipt of Signal Detector Verified
ML20086G864
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/02/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-75-37, NUDOCS 8401120546
Download: ML20086G864 (1)


Text

.

L2 O,-

O3

~

PHILADI2.P111A E1.ECTRIC COMPANY Peach Lotton Ato: sic Power Station

/

Delta, Pennsylvania 17314 July 2, 1975 Mr. Jaries P. D'Reilly, Director Office of Inspection and Enforecaent 7

j h

Region 1 United States Nuclear. Regulatory Commission-g

. \\hMM4M f-631 Park Avenue.

King of Prussia, Pennsylvania 19406

Subject:

Abnor ul Occurrence 74-Hour Notification Confituing R. S. Fleischmann's phone conversation with Mr. Ton Shedlowsky, Region 1 United States Nuclear Regulatory Cornist. ion on July 2,1975.

Reference:

License Number DPR-56 Technical Specification

Reference:

'. 3.1.. Table 3.1.1 Report No.:

50-278-75-27

^'

Report Date July 2, 1975 Occurrence Date: July 1, 1975

~~

Tacility:

Peach Botton Atonic Power Station R.D. 1. Delta, Pennsylvania 17314 Identification of Occurrence:

Main Stcan Line Radiation tionitor RIS 3-.17-251C failed downscale.

Conditions Prior to occurrence:

Plc.nt operating at approxinately 50: power.

Description of Occurrence Hain Stears Line Radiation F.onitor RIS 3-17-251C failed downscale while plant was operating at approxitately 50% power. The downscale resulted from a loss of signal due to failure of the test relay to pick up af ter testing.

Designation of Apparent Cause of Occurrence:

Failure of the test relay to pick up following test.

Analysis of Occurrence:

Honitor failed downscale which r.ade the particular channel inoperative. Because cf the redundant channels of instru Antation, the re::sining F.ain Stena Ling High Radiation Isolation c.nd Scram oignals still had tha capability of performing their intended functions. Minimal nafety. significance is attached to this occurrence.

Corrective Action:

The failed test relay was 1::=odistely replaced and it was verified that the draver

(

vas again receiving the signal detector.

Failure Data:

One previously reported as A.O. 50-278-75-16.

Very truly yours,

/ CWb - a <

W. T. Ullrich, Superintendenc Peach Botton Atonic Power Station