L2 O,-
O3
~
PHILADI2.P111A E1.ECTRIC COMPANY Peach Lotton Ato: sic Power Station
/
Delta, Pennsylvania 17314 July 2, 1975 Mr. Jaries P. D'Reilly, Director Office of Inspection and Enforecaent 7
j h
Region 1 United States Nuclear. Regulatory Commission-g
. \\hMM4M f-631 Park Avenue.
King of Prussia, Pennsylvania 19406
Subject:
Abnor ul Occurrence 74-Hour Notification Confituing R. S. Fleischmann's phone conversation with Mr. Ton Shedlowsky, Region 1 United States Nuclear Regulatory Cornist. ion on July 2,1975.
Reference:
License Number DPR-56 Technical Specification
Reference:
'. 3.1.. Table 3.1.1 Report No.:
50-278-75-27
^'
Report Date July 2, 1975 Occurrence Date: July 1, 1975
~~
Tacility:
Peach Botton Atonic Power Station R.D. 1. Delta, Pennsylvania 17314 Identification of Occurrence:
Main Stcan Line Radiation tionitor RIS 3-.17-251C failed downscale.
Conditions Prior to occurrence:
Plc.nt operating at approxinately 50: power.
Description of Occurrence Hain Stears Line Radiation F.onitor RIS 3-17-251C failed downscale while plant was operating at approxitately 50% power. The downscale resulted from a loss of signal due to failure of the test relay to pick up af ter testing.
Designation of Apparent Cause of Occurrence:
Failure of the test relay to pick up following test.
Analysis of Occurrence:
Honitor failed downscale which r.ade the particular channel inoperative. Because cf the redundant channels of instru Antation, the re::sining F.ain Stena Ling High Radiation Isolation c.nd Scram oignals still had tha capability of performing their intended functions. Minimal nafety. significance is attached to this occurrence.
Corrective Action:
The failed test relay was 1::=odistely replaced and it was verified that the draver
(
vas again receiving the signal detector.
Failure Data:
One previously reported as A.O. 50-278-75-16.
Very truly yours,
/ CWb - a <
W. T. Ullrich, Superintendenc Peach Botton Atonic Power Station
'm l
i O
8401120546 750711 l
PDR ADOCK 050002~J8 i
S PD3
-f 9