Monthly Operating Rept for Nov 1983
ML20086G778
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/30/1983
From: Ballinger P, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CNSS830756, NUDOCS 8401120401
Download: ML20086G778 (5)


Text

.

e.

OPERATING DATA REPORT .

DOCKET NO. 050-298 DATE 19-R-R3_

COMPLETED BY P _ 't Rn111nger TELEPHONE 402-825-3811 OPERATING STATUS c

1. Unit Name: Cooper Nuclear Station Notes' ',
2. Reporting Period:

November, 1983 2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 778 f

^-

6. Maximum Dependable Capacity (Gross MWe): 787 764 '
7. Maximum Dependable Capacity (Ne: MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

x

9. Power Level To Which Restricted. If Any (Net MWe).
10. Reasons For Restrictions.If Any:

This Month Yr.-to Date Cumulative

11. Hours In Reporting Period 720.0 8.016.0 82,561.0
12. Number Of Hours Reactor Was Critical 720.0 4,936.5 66,307.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 '

O.0

14. Hours Generator On-Line. _ . 720.0 4.864.2 65,236.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.07
16. Gross Thermal Emgy Generated (MWH) 1.050.024.0 9.452.784.0 129.514.086.0
17. Gross Electrical Energy Generated (MWH) 345.25 R _, 3.142.175.0 41.074.403.0

~ 18. Net Electrical Energy Generated (MWH) 331.062.0 3.027,351.0 39,600,811.0

19. Unit Senice Factor 100.0 60.7 . 79.0
20. Unit Availability Factor 100.0 60./ 79.0

~

21. Unit Capacity Factor (Using MDC Net) 60.2 -

49.4 '62.8

22. Unit Capacity Factor (Using DER Net) 59.1 48.5 61.7
23. Unit Forced Outage Rate 0.0 2.3 - 3.7 L
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

~

~

25. If Shut Down At End Of Report Pesiod. Estimated Date of Startup:
26. Units In i est Status (Prior Io Commercial Operation): Forecast Achieved /

INITIAL CRITICALITY i\

INITIAL ELECTRICITY COMMERCIAL OPERATION B401120401 831130 PDRADOCK05000g ,

pg R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-298 UNIT Cooper Nuclear Stat h...

DATE 12-8-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811

, ~ , .

MONTH November ,

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 7.

(MWe-i; t) . , (MWe-Net) 1- 486 _

r.

17 49I 2

482 gg 518

~

3 _. 484 39 _

492 4 487 20 387 5

482 21 489 377 22 487 6

481 23 501 J7 8 482 - '

24 ,

402 9-481 - '

25 404 10 483 26 401 11 486 '_ 27 401-12

- 484 _

g 487 13 399 29 489 14 199 30 491 15 4II 31 16

- .487 INSTRUCTIONS On this format. list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

O

() (9/77)

/s

s ., .

DUCKEI NO- 050-298 5

~

UNITS!!U~IDOWNS AND POWElt REDUCIlONS UNl r NAME Copper Nuclear Station,.

/ / -  : , t ,

nAIE 12-8-83 I' 3 < t COMPLE (ED IlY P. L. Ballinger 4

e ItEPORT MON 111 November

'I ELEPil0NE 402-825-3811

,- - a t

\ >

t i c1 ij<5 ,. ) "

,I*' j,2 c ,. -3w a . -

, .2 _e s , .5 X 4 Licensee . c% go Cause & Corrective s y' No. Date Q 3@ $ .5 s 5 Event F3 o3 Action to N H

$E 5 y g5 c Itcport 8' SU bU Prevent Recurrence

<.  ! u 83-8 831106 S 0 tl 4 NA NA. NA Reduce.d power per load' schedule and i u load demand

?

83-9 831120 S 0 H 4 NA NA NA Reduced power per load schedule and ,

, load demand

, , /

> 1 I ;2 e 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Pieparation of Data 11 Maintenance or Test 2 M.inual Seram. lint y Sheets foi 1.ieensee

' C itefneling 3 Automatic Scram. livent flepoit (LER)Iite(Niliti:G-D Regulatory llestriction 4 Other (Explain) 0161) li-Operator Tsaining & License IIxamination i Mministrative 5 G Operational Error (Explain) Exhibit I Same Source l'8/77) ll O:her (Explain) -

fp : ;- :.. -

.g.

.n Operations Narrative Cooper Nuclear Station

.!' Novemberc.1983 1

iThe plant operated the. month of November with no outages. Power was reduced

. on weekends due to low load' demand and extended Cycle 9 operating strategy.

~

The plant operated for the month with 100% availability and at a 59% capacity factor.

f.

f 1

1 t

i t

I i e

!t f,

1 1

,-w,- v,m,w v,,.e.-, ,< ,.em, p. ,,w--gr r, , ,,ngg.,v. nv . -g, y, , -n-,,.,y ma-, y - , -,_ym g- - , - , , , , ,

b

e- '4 9,

/% e o

  1. -~

COOPER NUCLEAR CTATioN

. Nebraska Public Power District " " "A"E4"o"R@l5.^A" "

CNSS830756 December 8, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Monthly Operation Status Report for November 1983 Docket No. 50-298 Centlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for November 1983. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sincerely, Wl W P. V. Thomason Division Manager of Nuclear Operations PVT:lb Enclosure cc: G. D. Watson w/ enc.

A. C. Gehr w/ enc.

J. T. Collins w/ene.

  1. y

-