ML20086G519

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-46 Re Borg-Warner Valve Manually Overtorqued During Hydrostatic Testing.Initially Reported 830715.Final Rept Delayed Until 840130 Due to Extensive Investigation & Evaluation
ML20086G519
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/21/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28482-BSK, DER-83-46, NUDOCS 8401120220
Download: ML20086G519 (2)


Text

r 3

=,

l Arizona Public Service Company P.o box 21666 e PHOENIX. ARIZONA 85036 December 21, 1983 ANPP-28482-BSK/KCP U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. T. W. Bishop, Director Division of Resident, Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-46 A 50.55(e) Potentially Reportable Deficiency Relating to Borg Warner Valve Manually Over-Torqued during Hydrostatic Testing.

File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between P. Narbut and R. Tucker on July 15, 1983.

(B) ANPP-27559, dated August 12, 1983 (Interim Report)

(C) ANPP-27910, dated September 28, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by December 14, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by January 30, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours CUJL qQ E. E. Van Brunt, Jr.

~-

8401120220 831221 APS Vice President, DR ADOCK 05000 Nuclear Projects Management ANPP Project Director EEVBJr./KCP:db cc: See Page 2 i=

E 3

+-

e.

f f:1:*

q-

-Mr._Tv W.-Bich:p e

' DER:83-32:

Page 2 cc:

Richard DeYoung, Director, Office' of. Inspection and Enforcement U. S. Nuclear Regulatory Commission

' Washington, D. C. 220555 T. : G.. Wood s, Jr.

,G.

C. Andognini J.-A. Roedel-D. B. Fasnacht A..C. Rogers

'B. S. Kaplan

-W. E. Ide J. Vorees.

-J. R. Bynum D. D. Green P. P. Klute A. C. Gehr W. J.' Stubblefield

.W. G. B1ngham R.,L.-Patterson R. W.' Welcher R. M.' Grant D. R. Hawkinson L. E. Vorderbrueggen

.G. A. Fiore111-S. R. Frost J. Self

'D. Canady Records Center -

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339

%