ML20086G065
| ML20086G065 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/31/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086G058 | List: |
| References | |
| AO-75-55, NUDOCS 8401100039 | |
| Download: ML20086G065 (1) | |
Text
-
+
l.
/*
=
PHILADELPHIA ELECTRIC COMPA5Y Peach Botto= Ato=ic P:ver Station Delta. Pennsylvania /
1731k July 31, 1975 Mr. Ja:es P.
O'Reilly, Director
- 4-
^
Office of Inspection and Enforce =ent Recion 1 gg United States Nuclear Regulatory Co= mission 631 Parh Avenue King cf Prussia. Pennsylvania 19kO6
Subject:
Abnormal Occurrence
- L-Ecur Notification 2
Confir=ing R.
S.
Fietsch= ann's phone conversation with Mr. Walt Baunack, Region 1, United States Nuclear Re6ulatory Co==ission on July 31. 1975.-
Reference:
License Nu=ter IPR-L4 Technical Specification
Reference:
4.5.B.la and k.5.B.lb i
i Report No.:
50-277-75-55 Report Date:
July 31, 1975 Occurrence Date:
July 31, 1975 Facility:
Peneb Bottom Atonic Power Station R.D.
1 Delta, Pennsylvania 1731k Identification of Occurrence:
2A High Pressure Service Water p u= p failed to start.
Conditions P.rior to Occurrence:
Unit 2 at 555 power.
Description of Occurrence:
While performing routine surveillance test 'ST 6.10 on the High Pressure Service *a~ater Syste=, the 2A pumpa failed to start.
Investiga. tion reveale that the breaker cell switch support van bent.
Designation of Apparent Cause of Occurrence:
apparently. bent.during' an operator The breaker cell switch support was qualification. test on July 29, 1975 in which the breaker was racked out and in.
Because there was no " work" associeted with this test, the pump was not run after the breaker was restored to service.
Analysis of Occurrence:
There are four High Pressure Service Wate} pumps, any one of which may supply any RER heat exchanger.
Technical Specifications permit operation for 15 days with 3 pumps out of service.
Therefore, the effect.on plant safety is sinimal.
Corrective Action:
_ J.Ihe. cell _sv!tch eupport._vas. st.raightened, the breaker restored to posit-1:
and the pu=p van run satisfactory.
The need to test equip =ent when l
returned to service. even if no " work" was done, v111 be e=phasized.
F ail u re-D at a r---
A previous failure of this type was reported as A3 50-278-75-36... _.