ML20086G011

From kanterella
Jump to navigation Jump to search
Telecopy AO 75-57:on 750817,reactor Recirculation Sys Outboard Sample Isolation Valve AO-2-2-40 Failed to Close During Testing.Caused by Stuck Solenoid Valve.Solenoid Valve Disassembled,Cleaned & Repaired
ML20086G011
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/18/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086G009 List:
References
AO-75-57, NUDOCS 8401090792
Download: ML20086G011 (1)


Text

4 I

r PHILADELPHIA ELECTRIC CO!!PANY /

P t a c h-Bo t.e "-

  • t+-- t e P aue " A t n tion

~'

Delta Pennsylvania 1731k August 18, 1975 Mr. Janea P.

O'Reilly, Director l

Office of Inspection and Enforcement 1AN

{

Region 1 gg United States nuclear Regulatory Concission 631 Park Avenue King of Prussia. Pennsylvania 19406 i

Subject:

Ahn rirr al Occurrence 2L: Hour N'o t i f i c a i. l o ri

~

Confirning V.

T.

U11 rich's phone conversation with Mr. Jim Partlov, Region 1, United States Euclear Regulatory Cm.rd ssion.nn August 17. 29Y5

Reference:

Licence Nueber DPH-bh s.m t ut g

_._ m r_ 1en y,.

=r-n-

- i- _ - -

- - <m n - < r.? ; t _--- - - -

Report No.:

50-277-75-57 Report Date:

August 1C 1975 Occurrence Date:

August 17, 1975 Facility:

Peach Botton Atomic Power Station R.D. 1, Delta, Pennsylvania 1731h Identification of Occurrence:

Reactor Recirculation Systen Outboard Sample Isolation Valve, AO-2-2-L@

failure to close during test.

Conditione Prior to Occurrence:

Unit 2 reactor shut'down..

Description of Occurrence:

During the performance of ST 1.3, the PCIS Logic System Functional Testo valve AO-2-2-hD failed to close.

Designation of Apparent Cause of Occurrence:

Stuck solenoid valve.

Analysis of Occurrence:

The cafety significance of this occurrence is minimal since the inboard isolation valve AO-2-2-35 was found to close satisfactorily.

Corrective Action:

The solenoid valve was disassembled, cleaned.and repaired.

The valve was retested subsequent to repair.

In the interin, the inboard isolati@

valve AO-2-2-3d was caintained closed.

s t

failure Data:

j Previous failures of this type were reported as:

AO-50-277-75-14 (Failure of AO-2-39 to fully close)

AO-50-278-74-23 (Pailure of AO-2-39 to fully close)

Very truly yours,.

W / $ C t"l-d W. T. Ullrich, Superintendent Peach Botton Atocic Power Station' MS4 - svtumsvernreetermwamch.o-.r -,-

_ --.-- -- - -, -, mara 8401090792 750027 PDR ADOCK 05000277 S

PDR i

n.