ML20086F615

From kanterella
Jump to navigation Jump to search
Ao:On 750711,control Rod L-5 Dropped,Causing Load Runback to Approx 70% Power.Caused by Defective Stationary Gripper Coil
ML20086F615
Person / Time
Site: Robinson 
Issue date: 07/14/1975
From: Mcgirt J
CAROLINA POWER & LIGHT CO.
To: Knuth D, Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8401030433
Download: ML20086F615 (1)


Text

,

(o%

a

_ A _n C0%L 4

I l

i

{,

CaroHna Powar & LigM Company strew w 6astunacaoxu n

H. B. ROBINSON S??M ILIUTRIC PIMir Post Offica Ecx 773

  1. g hrtaville, South Ccrolina M

July % 1975 g j f

't Robinson File No. 2-0-4-a-1 Mr. Nor: san C. Mocoley, Director Directorato of Peplatary Operations U. S. Nuclear Regulatory Ccminnion Regica IL, SuLte 818 230 Poachtree Street, N.V.

Atlanta, Georgia 30303 Mr. Donald Knuth, D1 vetor Directorate of Fegulatory Operations U. S. Nuclear Regulatory Comniesion hahingten, D. C, M545 LWir Sirs:

In accordance eith Sectica 6.6.2 of the Technical Specifications, the following Absornn.1 Oecurrence in reported.

At 1357, July 11,1975, while operating normaly at full powr, control rod L-5 (in the rully vitbriruvn shutdcyn tank) dropped. This caused a load lunback to approxinately 70% pruer. The flux tilts geners.ted by this dropped red exeneded 9%, violating Technical Specification 3.10.3.2.

Duo to the flux tilts and the in:ibility to quickly corrtet the rod prohina, pcwor vr s reduced and the reactor vaa shutdown at 1/48. The a

atationary gripper coil was found to be defsetive, and, folleving a plant cooldown, the entire coil stack on CarH 1-5 van replaced.

This event ecuatituten an Abnorval G currence as defined by Technical Specifi. cation 1.8.b sed was reportel to Mr. Neal &nder of NHC, Atlanta, en July % 1975.

Years very tral,

Jack U. McGirt, Managor.

H. B,.Rubinson S E Plant ACT:gg

,h I

8401030433 750714 PDR ADOCK 05000261 S

PDR k