Special Rept 91-16:on 911021,auxiliary Bldg Door A-5 Breached to Facilitate 1B RHR Pump Room Cooler Replacement for More than 7 Days.Fire Watch Established.Temporary Ventilation Removed & Door Closed on 911029
ML20086F295
Person / Time
Site: Sequoyah 
Issue date: 11/27/1991
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-16, NUDOCS 9112030182
Download: ML20086F295 (3)


Text

- - -.

... ~. -

1 wwwe voey, imen, no.n oma n3 mn s% om r,,onn., v3o J. L Wdson vu manent seavoyan %.a m rw November 27, 1991 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket No. 50-327 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - DOCKET NO. 50-327 - FACILITY OPERATING LICENSE DPR SPECIAL REPORT 91-16 This special report provides details concerning auxiliary building Fire Door A-5 being breached for greater than seven days to_ facilitate the IB residual heat removal room cooler replacement and to allow temporary ventilation to be established for room cooling. This report is being made in accordance with Technical Specification Action Statement 3.7.12.a..The enclosure contains the detalls concerning the condition.

If you have any questions concerning this submittal, please telephone M. A. Cooper at (615) 843-8924 hincerely,

& ' / ert 3

[-L. Wilson i

Enclosure cc:

See page 2 i

si

  • s 9112030182 911127

/

l PDR ADOCK 05000327 h

PDR

7,-

?*.

1 1

l i

}

2 t

j=

U.S. Nuclear Regulatory Commission November 27, 1991 i

i j

cc.(Enclosure):

{

Mr. D. E.-LaBarge, Project Manager i.

U.S. Nuclear Regulatory Commission l

.One White Flint, North 11555 Rockville Pike 2

i.

Rockville, Maryland 20852 NRC Resident Inspector j

Sequoyah Nuclear Plant F

2600 Igou Ferry Road 1

Soddy-Daisy, Tennessee 37379 i

Mr.'B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II j

101 Marietta Street,-NW, Suite 2900 Atlanta, Georgia 30323 i

}

$~

l 4-ffc i

I a

4

-. - - ~. - ~,. ~.

.e SEQUOYAI! NUCLEAR PLANT (SQN)

SPECIAL REPORT 91 ic

-On' October 21, 1991, with Unit 1 shut down for refueling activities, auxiliary building. Door A-5 was breached to facilitate the IB residual heat removal (RHR) pump room cooler replacement and to allow temporary ventilation to be.

established for the room. The breach was to remain in effect as necessary to support replacement of the room cooler. A fire watch was established in accordance with-technical specifications.

On October 29 1991, at 0700 Eastern standard time the temporary ventilation was removed and the door was closed.