ML20086E021

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,changing Tech Specs Re Emergency Svc Water Pump Surveillance Testing, Incorporating ASME Section XI on Frequency of Surveillance Testing & Making Editorial Corrections
ML20086E021
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/19/1991
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086E026 List:
References
JPN-91-064, JPN-91-64, NUDOCS 9111270029
Download: ML20086E021 (2)


Text

_-__ _ - - - - - - - - - - - - -

U.1 Mmn Snet W M r N ns tw

  • V A % 01 m wns
  1. > NewYorkPower u m ....

4# Authority noyom3ct,3,,p3, lrt,%;r" JPN 910G4 U. S. Nuclear Regulatory Commisson ATTN.: Document Control Desk Mall Station P1 137 Washington, D.C. 20555 '

SUBJECT:

James A. FitzPatrick Nuctoar Power Plant Dockot No. 50 333 Proposed Changes to the Technical Specifications A3ME Section XI and ESW Pump Surveillance Testing (JPTS 90 023)

REFERENCE:

1. NYPA letter, W. Fornandoz to NRC, dated April 15,1991, (JAFP 910228),'Updato of the Status of Activities for tho Emergency Servico Water System."

Dear Sir:

This application for an amendmont to the James A. FitzPatrick Technical Specifications addrossos three associated issues: Emergency Servico Water (ESW) pump survoillanco testing; incorporation of ASME Section XI, and; oditorial corrections.

ESW Pump Surveillanco Testing /M!nimum Flowrato A survollianco toquiromont for the ESW system is added requiring ESW pumps to bo flowrate tested. During the August 21,1990 ESW onforcement conforence the Authority identiflod the limitations of tho ' shut off head" ESW pump survoillanco test currently required by the FitzPatrick Tshnical Specifications and committed to proparo a Technical Specification chango. In Reference 1, the Authority clarified it's commitmont and stated that tho now test requirements would refloct the appropriato portions of ASME Section XI and the FitzPatrick inservice test program. The proposed survoillanco requiremont includos a revisod pump flowrate to reflect a now calculation of system requirements following a Design Basis Accident (DBA). This application satisfies that commitment.

Incorporation of ASME Section XI This part of the amendmont incorporatos the inservice inspection and testing of Section XI of the American Socloty of Mechanical Engincors (ASME) Boller and Prossuro Vossol (B&PV)

Code. It incorporatos a now Survoillanco Requiremont,4.0.E, which refers to the requirements of Section XI of the ASME B&PV Codo and Addenda established by 10 CFR 50.55a(g).

Ancillary changes are also toquired because the proposed Spoclfication 4.0.E replaces surveillanco testing requiremonts on safety related pump and motor operated valvos and o.?. ands the frequency of survolliance testing on other components from once overy month, to once ovory throo months to coincido with the Authority ASME Section XI program.

4'111270029'911li9 FDR ADOM ODOC 3 4

i

Editorial Cortoctions Minor changos such as typographical errors and corrections oro also includod in this submittal.

Enclosed for filing is tho signed origi'Tal of a document entitled " Application for Amendmont to Oporating Uconso," with Attachmonts I and ll thoroto, comprising a statomont of the proposod chango to tho Technical Specifications and tho associated Safoty Evaluation.

In accordanco with 10 CFR 50.91, a copy of this application and tho associated attachmonts aro being provided to the designated Now York Stato official.

Should you on your staff have any questions rogarding the proposed changos, please contact Mr J. A. Gray, Jr.

Very\y, truly y(ours, j / ,

\. " N f( 0 b A K1 RalpA E. Goodlo

(

Executivo Vice Prosident Nuclear Generation att: as stated cc: Rogional Administrator U. S. Nuclear Regulatory Commission 475 Allendalo Road King of Prussia, PA 1940G Offico of the Resident inspector U. S. Nucioar Rogulatory Commission P. O. Box 136 Lycoming, NY 13093 Mr. Brian C. McCabo Projoct Diroctorato 11 Division of Roactor Projects 1/11 U. S. Nuclear Rogutatory Commission Mall Stop 14 B2 Washington, DC 20655 Ms. Donna Ross Now York Stato Energy Offico 2 Empire Stato Plaza 16thFloor Albany, NY 12223 i

. . . -