Interim Deficiency Rept Re Concrete Floor Topping in Diesel Area of Auxiliary Bldg Placed W/O Installation of Specified Reinforcing Rod.Initially Reported on 730220.Topping Removed & Will Be Replaced as Specified W/Reinforcing Rods
ML20086C659
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/20/1973
From: Betz J
Public Service Enterprise Group
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086C656 List:
References
NUDOCS 8311290062
Download: ML20086C659 (2)


Text

,

y . S** jR O

John F. Betz PutGc Service Electric and Gas Compan/ 80 Park Place Newark, N J 07101 201/622-7000, Vice President in Charge of Elecinc Operahon March ?O, 1973 U.S. Atomic Energy Commission Director of Regulatory Operationc 7920 Norfolk Avenue Bethesda, Maryland 20014 Attention of Mr. Frank E. Kruesi Director Gentlemen:

FLOOR TOPPING REINFORCING -

AUXILIARY BUILDING DIESEL AREA NO. 1 AND 2 UNITS SALEM NUCLEAR GENERATING STATION On February 20, 1973 it came to our attention-that the concrete floor topping in the diesel area of the auxiliary-building had been placed without the installation of the specified reinforcing. rod. This nonconformance was reported to the U.S. Atomic Energy Commission, Directorate of Regulatory-Operations, Region'l on February 20, 1973.

Since concrete floor topping is not intended or designed to be a part of the supporting. structure, it is normally placed over the structural slab without reinforcing on the basis of architectural drawings. - The intended reinforcing,which was an exception to normal practice, was shown on a structural drawing that had been overlooked at the time of concrete placement.

The nonconforming concrete topping, which had been-placed in 'the diesel area, has been removed and will be replaced as specified_with reinforcing rods.

To prevent a recurrence of errors-in the placement-of concrete, all applicable drawings will be ' listed on :the nconcrete placement- sheets . and . reviewed and approved .by . the ; job engineer -

prior to concrete placement. The'. quality control inspectors -u will carry out strict _ surveillance _tofassure implementationiof?

Field Procedure FP-5,." Manufacture, Placement 1 and Curing of Concrete." ' "

m

.'e

g[h[i]~

t 8311290062 730411 ppR ADOCK 05000 .

d,.0091 1

. s _-.

() L

.-=~L - - - .)

c o o U.S. Atomic Energy 3-20-73 Commincion Comple ted concre te placement sheets for similar types of concrete placement will be reviewed in detail to further verify compliance with procedures.

Very truly yours,

('

.i CC Mr. J. P. O'Reilly Newark, N. .T .

l l

t

- , _ , .,