AO 50-267/74-13:on 740707,excessive Loss in Static Seal Actuator Pressure for Helium Circulator a Observed.Cause Unknown.Circulator Will Be Replaced
ML20086B459
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/11/1974
From: Brey H, Rodgers W
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20086B449 List:
References
AO-50-267-74-13, NUDOCS 8311170243
Download: ML20086B459 (3)


Text

.

)

Ju]y i g ]974 An!!O:UIAL OCCiiR"I";CE g.7 7,

1 10RT ST. VEI:! I;UCLI:AR GE ISRATil:G ST/. TION PUnblC SP.nVICI CO':PANY OF' C01 ORADO P. O. J:0X 361 PLATTEVILLls, COLOil.4J)0 80651 REPonT 1;0. 50-267/74/33 Prelhainary 1DE!TlPIC.\\TIO:; 0F OCCUnn':':CE :

The fo11ouing is considered an Abnormal Occurrence under definition 2.1 e of the Technical Specifications.

On July 7, 1974, excessive loss in the static ccal actuator pressure for "A" Helium Circulator was observed.

CO:iDITIO::S PRIOR TO _OCCURni.:;CE:

Steady State Poucr Routine Shutdown llot Shutdown Routine Load Chanr,c Co.La Clautcoun A

Ottier (specity)

Refueling Shutdown Reactor shutdown with PCRV Routine Startup at attonpheric pressure

- The major plant parameters at the time of the event were as follows:

Pouer PTR N/A M.'t h Elect.

n/A MWe Secondary Coolast Pressure M]A psig' Temperature N/A

'F i

Flow N/A

  1. /hr.

l Primary Cool.mt Pressurc 0

psig Temperature 175

  • F Core Inlet t

125

  • F Core Outlet 8311170243 741022 PDR ADOCK 05000267 S

PDR Flow 0

  1. /hr.

e e

9

..~.- - -

O

.rke r e

DESCRIPT10:1 0F

)

OCCUimi:::CI;:

s I

On July 7, 1974, an excensive increase in the bleed off rate of t.he helium gas bott.le nuppl:/ing the ntatic neal. nctuator on "A" helium 1

c.irculator was observed.

i j

Suhacquent. Jeak checkinr, on tLiu tiystem.indleates thaf the leakage

~

point is internal to the nachine.

i APPARimr CAUSE OF l

OCCUl RITC F. -

Design Unusual Service Cond.

. i lucluding Pnviron.

j P

I Manufacture Component Tailure l

Installat lon/Const.

X Other (specify)

)

l Operator See belov j

i l

Procedure l

t

' The cause of this failure in presently unkum.n.

Preparations are currently underucy to remove this heliu,n circulator nr.3 r. place it with a spare unit.

Af ter rcnoval of "A" hallua circulat.or the static seal mechcnion vill bc l

j Jnspected to detemine cause of. the fai. lure.

l

!.':!.h'1CIC Or OCCUPJu:::CF.:

l The r.Latic seal act.unting ncchanic.m vill be inspected after renoval of the i

i helium circulator.

i l

- CORRECTIVE i

ACTIO"-

4 The circulator uith the defective static scal actuating mechanicm vill be replnced with.a cparc. unit.

i

_TAILURE DATA /ST 11LAR RFPORTFD OCCURRD;CES:

I This node of static seal failure han not occurred before.

The subject of Abnornal occurrence #50-267/74/10 ddted June 3,1914, vas leakage of l

l

- prJmary coolant by tt' static seal on "B" Hell'um Circulator due to l-particulate natter betueen the scaling surfaces.. Thecc tuo types of i

i failure are not considered similiar.

l

~

PROGRA'MATIC IMPACT.

Approxiantely.35 days are rcquired to completely change. out a helium circulator,,

Due to our present schedule this circulator change out will delay the overall testing program approximately two v!cks.

9 0

---wr-e.-=---*.-eew-wwe-=

_.,,*,---eww--,a+==m.

we.w..

.wy-s.

-.- -, idI'A*#

,_,--eem-w

.-_---_------ww m, e aw,-------4,,,mm.-

am

--_,.-%y.

m;

--a pw.m-m g

e.

Pa f',(*

3 I

h 0

l f

com: memr:

t 6

None l

f

(

s I

1 I

e r

ew.

,:.:.,:po n

\\ ) w.,\\

s. s_.u,,

w U. Duane nodgern, Oreratio:n; nupervisor II,1ery Brey, s.. erintendant-0;mrct f or.s I